Construction loan calculator: interest during the build and payment after

Estimate what a construction loan costs. Enter the loan, the rate, the build time and the average share drawn, and get the interest during construction, the interest-only payment at the full balance and the monthly payment once the loan converts.

Free, no sign-upRuns in your browser — nothing is sent anywhereFormulas shownCopy a link to share your numbers
Tool 23

Construction loan: interest during the build & payment after

Enter the loan, the rate, the build time and how much of the loan is drawn on average, and get the interest during construction and the monthly payment once it converts.

The loan

Result

Interest during construction = loan × average share drawn × rate × months ÷ 12. Interest-only payment at full balance = loan × rate ÷ 12. Permanent payment = loan × r ÷ (1 − (1 + r)^−n), where r is the monthly rate and n the number of months.

How to use it

  1. Enter the loan amount and the construction interest rate.
  2. Enter the construction period in months and the average share of the loan drawn.
  3. Enter the permanent rate and term.
  4. Read the interest during the build and the payment after conversion.

A worked example

A $400,000 loan at 7.5% for 10 months, with draws averaging 50% of the loan, costs $12,500 in interest during the build. At full balance the interest-only payment would be $2,500 a month. Converted to a 30-year loan at 7%, the payment is $2,661 a month.

How the interest on a construction loan works

A construction loan is paid out in draws as work is completed, and interest is charged only on the amount drawn so far. The balance, and the interest, grow through the build. If draws were spread evenly from zero to the full loan, the average balance would be half the loan; front-loaded draws (land, foundation) raise the average and back-loaded ones lower it. Use the lender's draw schedule for the real figure.

What else it costs

Origination fees or points, inspection fees for each draw, an interest reserve held in the loan, and a contingency. The budget should show the interest reserve as its own line; see the cash flow forecasting guide for how draws and payments line up.

Want the background? The guide works through the arithmetic, the mistakes that hide problems, and a checklist.
Read: the guide →

Questions

How is interest calculated on a construction loan?

Only on the amount drawn so far, so the interest grows through the build. This calculator multiplies the loan by the average share drawn, the rate and the months divided by 12.

What is an interest reserve?

A part of the loan set aside to pay the interest during construction, so the borrower does not have to pay it out of pocket.

What happens to a construction loan after the build?

It either converts to a permanent mortgage (a construction-to-permanent loan) or is paid off by a separate mortgage. The permanent payment is the standard amortization formula.

Is a construction loan interest-only?

Usually during the build: you pay interest on the drawn balance, and principal is repaid when the loan converts or is refinanced.

More free calculators

Want this on your live data, every morning?

These tools are manual. The dashboard does the same arithmetic across every job, every company and every week — plus the money-at-risk view, the audit findings and the overrun radar. Join the private beta and we will connect it to the systems you already run.