Constructelligence
Resources

Construction AI, software and finance, explained

Where AI actually helps a contractor, the software worth running and how it fits together, and the construction finance underneath — guides that work one job through the numbers, calculators that run the same formulas on yours, converters that turn construction PDFs into spreadsheets, and templates to start from. Free, no sign-up, and nothing you type leaves your browser.

92 guides23 calculators3 PDF converters90 templates79 glossary terms

Reviewed September 2026

Start here

Choosing software & AIWhich tools are worth buying, and how do they fit together?Best construction management software →The best construction AI tools (2026) →The construction tech stack →
Owners & CFOsIs the business making money, and where is the cash?The 12 KPIs that matter →13-week cash flow forecast →The WIP schedule →
Project managersIs my job going over, and what do I do about it?Job cost forecasting (EAC) →Change order management →Labor forecasting →

AI in construction10 guides

Where AI genuinely helps a contractor today — takeoff, estimating, scheduling, progress, safety and document review — and how to tell a real tool from a demo.

The best construction AI tools in 2026, by category

The construction AI tools worth knowing in 2026 — estimating and takeoff, scheduling, progress tracking, safety, documents, finance and robotics — what each does, who it suits and what to check.+1312 min read · 1 diagramCalculatorTemplate

AI in construction: what construction AI does today and where to start

How AI is used in construction in 2026: the use cases that work — takeoff, scheduling, progress tracking, safety, document review, cost forecasting — what each needs, the risks, and a 90-day plan.12 min read · 2 diagramsCalculatorTemplate

Construction AI tools: what they do and how to choose one

The six kinds of construction AI tools, the data each needs, and ten questions to ask any vendor.7 min read

AI construction estimating: how AI takeoff works and how to test it

How AI construction estimating and takeoff software works, what it gets right and wrong, how to test accuracy on your own drawings, and how to turn a faster takeoff into more bids.10 min read · 2 diagramsCalculatorTemplate

AI for construction scheduling and project management

How AI is used in construction scheduling and project management: generative scheduling, schedule risk forecasting, AI in Procore and Autodesk Forma, what data it needs and how to judge the forecast.10 min read · 1 diagramCalculatorTemplate

AI for construction safety and progress tracking

How AI construction safety monitoring and progress tracking work — site cameras, 360° capture, lidar and photo analysis — what they catch, alert fatigue, and how to tie progress to cost.10 min read · 1 diagramCalculatorTemplate

AI for construction documents: contracts, specs, submittals and RFIs

How AI reviews construction contracts, searches specs, checks submittals and drafts RFIs — which clauses to check, why citations matter, how to test a tool, and keeping documents secure.10 min read · 1 diagramCalculatorTemplate

ChatGPT for construction: 30 prompts for contractors

30 ready-to-use ChatGPT prompts for construction — RFIs, change orders, scopes, meeting minutes, safety talks, owner updates, estimating checks — plus the rules for what never to paste.9 min read · 2 diagramsCalculatorTemplate
AI in construction

Construction AI compared: six kinds of tool, what each needs, and how to test themNew

Construction AI compared by kind: progress tracking, safety cameras, document AI, scheduling AI, cost forecasting and general assistants, with how to test each.7 min readCalculatorTemplate
AI in construction

Site safety AI cameras: how they work, what they detect, and what to ask before a pilotNew

How AI safety cameras work on construction sites: fixed cameras and computer vision for PPE and exclusion zones, privacy, false alerts, pricing and pilots.7 min readCalculatorTemplate

Construction software & tech11 guides

The systems a contractor runs and how they fit together: project management, accounting and ERP, estimating, scheduling, dashboards and the reporting layer on top.

Construction intelligence: what it means, how it works and what to buyNew

Construction intelligence explained: market and project-lead intelligence versus intelligence from your own job data — what each does, the data it needs, how it differs from BI and ERP reports, and how to evaluate a platform.13 min read · 2 diagramsCalculatorTemplate

The construction tech stack: what a contractor needs and how it connects

The construction software a contractor actually needs — ERP, project management, field, scheduling, estimating, documents and intelligence — what each layer owns, how they connect, and what to buy first.11 min read · 1 diagramCalculatorTemplate

The best construction management software in 2026: 12 platforms compared, and how to choose

The best construction management software in 2026 — Procore, Autodesk Forma, Oracle Aconex, Trimble ProjectSight, CMiC, Fieldwire, Raken, Buildertrend, JobTread, Houzz Pro, Knowify — who each suits and what to check.+516 min read · 1 diagramCalculatorTemplate

Construction accounting software and ERP: job costing features, the main systems and how to choose

Construction accounting software and ERP compared for 2026 — Sage 300 CRE, Sage Intacct Construction, Viewpoint Vista and Spectrum, Foundation, CMiC, Acumatica, QuickBooks — the features that matter and how to choose.11 min read · 1 diagramCalculatorTemplate

Construction estimating software: takeoff and bid tools compared

Construction estimating and takeoff software for 2026 — Bluebeam, On-Screen Takeoff, PlanSwift, STACK, ProEst, Sage Estimating, HCSS HeavyBid, Accubid and AI takeoff — by trade, with what to check.+19 min read · 1 diagramCalculatorTemplate

Construction quantity takeoff software: the tools, by trade, and how to test oneNew

Construction takeoff software compared for 2026 — Bluebeam Revu, On-Screen Takeoff, PlanSwift, STACK, Autodesk Takeoff, AGTEK and AI takeoff — what each measures well, by trade, and how to test accuracy.+110 min read · 2 diagramsCalculatorTemplate

Best construction scheduling software: Primavera P6, Microsoft Project and the rest

Construction scheduling software compared — Primavera P6, Microsoft Project, Asta Powerproject, Smartsheet and linear scheduling — when each fits, what a healthy schedule looks like, and the DCMA checks.+211 min read · 1 diagramCalculatorTemplate

Construction dashboards and BI: Power BI, Excel or construction intelligence?

How contractors build construction dashboards — Excel, Power BI and construction intelligence platforms compared — the KPIs a dashboard needs, why construction data is hard to model, and what it costs to maintain.10 min read · 1 diagramCalculatorTemplate

Construction technology trends in 2026: what is actually changing

The construction technology trends that matter in 2026 — AI agents, connected data platforms, reality capture, construction intelligence, prefabrication, robotics, drones and sensors — with what each means for a contractor this year.9 min read · 1 diagramCalculatorTemplate

Sage 300 CRE reporting: job cost, WIP and dashboards without rebuilding Excel

How contractors report from Sage 300 CRE — job cost, committed cost, WIP and forecasts — the usual report designer, Crystal and Excel routes, where they break, and how to get weekly answers instead.10 min read · 1 diagramCalculatorTemplate

QuickBooks job costing for contractors: setup, reports and when you outgrow it

How to set up job costing in QuickBooks for construction — jobs, cost codes as items, classes, progress invoicing — the reports to use, the limits (retainage, committed cost, WIP), and signs you have outgrown it.10 min read · 1 diagramCalculatorTemplate

Software by trade19 guides

What each trade actually needs to run and track — general contractors, kitchen and bath, electrical, plumbing, mechanical, elevator, concrete, roofing, sitework, civil and utility, drywall, plastering, flooring, countertops and painting.

Construction software by trade

The software each construction trade runs — GCs, home builders, remodelers, kitchen and bath, electrical, plumbing, HVAC, concrete, roofing, sitework, civil and utility, drywall, plastering, flooring, painting, countertops, elevators and deck builders — the numbers to track, and where jobs lose money.6 min read · 1 diagramCalculatorTemplate

General contractor software

Software for general contractors: project management, construction accounting, scheduling and forecasting — what GCs run, what to track, and where margin leaks.+29 min read · 2 diagramsCalculatorTemplate

Electrical contractor software

Software for electrical contractors: estimating with labor units, project management, union payroll and job cost forecasting — and how to catch labor overruns early.+29 min read · 2 diagramsCalculatorTemplate

Plumbing software: what plumbing contractors run, what to track, and where jobs lose money

Plumbing software for contractors: field service and dispatch, construction project management, estimating and job costing — which to run, and the numbers that show a job going over.+19 min read · 2 diagramsCalculatorTemplate

HVAC and mechanical contractor software

Software for HVAC and mechanical contractors: equipment procurement, sheet metal and piping labor, service agreements and job cost forecasting — what to run and track.+29 min read · 2 diagramsCalculatorTemplate

Concrete contractor software

Software for concrete contractors: estimating, crew and equipment costing, pour tracking and job cost forecasting — what to run and the unit costs worth watching.9 min read · 2 diagramsCalculatorTemplate

Roofing contractor software

Software for roofing contractors: CRM and sales, aerial measurement, estimating, production and job costing — what to run and how to see margin per job.9 min read · 2 diagramsCalculatorTemplate

Excavation and sitework contractor software

Software for excavation, sitework and civil contractors: estimating by crew and equipment, field quantities, equipment costing and forecasting — what to run and track.9 min read · 2 diagramsCalculatorTemplate

Drywall and interiors contractor software

Software for drywall, framing and interiors contractors: takeoff, labor by square foot, change orders and job cost forecasting — what to run and what to track weekly.+39 min read · 2 diagramsCalculatorTemplate

Home builder software

Home builder software for custom, spec and production builders: scheduling, selections and allowances, construction draws, job costing — what builders run and the numbers that protect margin.9 min read · 3 diagramsCalculatorTemplate

Remodeling contractor software: kitchen and bath project management, selections and job costingNew

Remodeling contractor software for kitchen and bath remodelers: estimating, selections, hidden conditions, cabinet and countertop lead times, change orders and job costing.10 min read · 1 diagramCalculatorTemplate

Deck builder software: project management, pricing and where deck jobs lose money

Deck builder software and project management: estimating by square foot and railing foot, scheduling crews, deposits, change orders and job costing — what deck builders run and track.10 min read · 3 diagramsCalculatorTemplate

Civil and utility contractor software: heavy civil estimating, pay items, quantities and job costNew

Civil construction software for heavy civil and utility contractors: pay-item estimating, installed quantities, DOT pay estimates, certified payroll, equipment and unit cost.+110 min read · 1 diagramCalculatorTemplate

Flooring contractor software: estimating, moisture, waste and job costing per square footNew

Flooring contractor software: takeoff and seam planning, material and waste, moisture testing, scheduling installers, and job costing per square foot — what to run and track.9 min read · 1 diagramCalculatorTemplate

Painting contractor software: estimating, production rates and job costingNew

Painting contractor software: estimating from surfaces, coats and production rates, crew scheduling, change orders and job costing — what residential and commercial painters run.+19 min read · 1 diagramCalculatorTemplate

Kitchen and bath remodeler project management software: design, selections, change orders and job costingNew

Kitchen and bath remodeler software: design, selections and allowances, long-lead orders, change orders and job costing. What K&B remodelers run, and where margin goes.9 min read · 1 diagramCalculatorTemplate

Countertop installer software: quoting, templating, slab yield and job costingNew

Countertop fabricator and installer software: quoting from a slab layout, templating, slab and remnant inventory, scheduling installs, and yield and job costing.9 min read · 1 diagramCalculatorTemplate

Plastering contractor software: estimating, production rates and job costingNew

Plastering contractor software: estimating by system and coat, production rates, scheduling crews around other trades and weather, back-charges and job costing.9 min read · 1 diagramCalculatorTemplate

Elevator contractor software: installation, modernization, service and job costingNew

Elevator contractor software for installation, modernization and service: estimating, committed equipment cost, install labor by car, inspections and service contracts.9 min read · 1 diagramCalculatorTemplate

Forecasting & cost6 guides

Cost at completion, committed cost, earned value, labour productivity and cost codes: the arithmetic that tells you where a job is heading while there is still time.

Job cost forecasting: how to forecast a job’s cost at completion

How contractors forecast cost at completion (EAC): the four methods, the formulas, a worked example, the mistakes that hide overruns, and how forecasting from past jobs helps.10 min read · 2 diagramsCalculatorTemplate

Committed cost in construction: track buyout and the exposure still to buyNew

What committed cost is, how to track buyout against budget, the projected-cost formula that includes uncommitted scope, a worked example and a buyout log template.9 min read · 2 diagramsCalculatorTemplate

Earned value management for construction, explained with one job

Earned value management (EVM) for contractors: planned value, earned value and actual cost; cost and schedule variance; CPI, SPI and TCPI; EAC and ETC — with a worked example and the mistakes to avoid.12 min read · 2 diagramsCalculatorTemplate

Construction labor forecasting: from burn rate to machine learning

How to forecast construction labor hours and cost: productivity factors, earned hours, straight-line vs learning-curve vs machine-learning forecasts, and how to test which one to trust.10 min read · 2 diagramsCalculatorTemplate

Construction cost codes: how to structure them and what they can tell you

How construction cost codes work: structure, CSI MasterFormat divisions, cost types, how many codes to use, and how cross-job cost-code analysis separates estimating problems from site problems.9 min read · 2 diagramsCalculatorTemplate
Forecasting & cost

Construction cost management software: what it covers, how the pieces connect, and how to choose

Construction cost management software explained: budget, commitments, change events, forecasts and billing in one chain, and the questions that separate tools.8 min readCalculatorTemplate

Billing & cash7 guides

Progress billing and the cash behind it: pay applications, the schedule of values, retainage, lien waivers and a 13-week cash-flow forecast.

The WIP schedule: over-billing, under-billing and why they matter

How a construction WIP schedule works: percentage of completion, earned revenue, over- and under-billing formulas, a worked example, and the errors lenders and sureties look for.9 min read · 2 diagramsCalculatorTemplate

Schedule of values in construction: a worked example, how to build one and how to avoid front-loadingNew

What a schedule of values is, how to break a contract sum into billable lines, a worked example that ties to a G703, front-loading and how to catch it, and a free template.9 min read · 2 diagramsCalculatorTemplate

Construction invoice template: what to put on it, a filled-in example, and a free downloadNew

A free construction invoice template with a filled-in progress invoice: the fields every contractor invoice needs, retainage and change orders, T&M and final invoices, and the mistakes that delay payment.9 min read · 1 diagramCalculatorTemplate

AIA G702 example and G703 sample: how to fill out a pay application, line by line

How to fill out the AIA G702 Application and Certificate for Payment and the G703 continuation sheet: every line explained, a worked example, the math that must tie out, and common rejection reasons.13 min read · 2 diagramsCalculatorTemplate

Retainage in construction: how it works and how to get it back

How construction retainage works: typical rates, how it flows from owner to GC to subs, retainage reduction, release at completion, how it shows on the WIP and pay application, and how to track it.10 min read · 2 diagramsCalculatorTemplate

Lien waivers in construction: the four types, when to sign each, and how to track themNew

Conditional and unconditional, progress and final lien waivers explained: when to sign each, what amount goes on them, how exceptions work, and a waiver log template.10 min read · 1 diagramCalculatorTemplate

Construction cash flow forecasting: a 13-week model that works

How contractors forecast cash flow: the 13-week model, billing and payment timing, retainage, payroll and subcontractor payments, finding the low point, and what to do before it arrives.10 min read · 2 diagramsCalculatorTemplate

Scheduling & field5 guides

The critical path, the three-week look-ahead, and the safety and field metrics that show whether the plan is actually holding.

The critical path method in construction, worked through one schedule

How the critical path method works on a construction schedule: forward and backward pass, total and free float, what a delay does to the finish, and the checks that keep a CPM schedule honest.11 min read · 2 diagramsCalculatorTemplate

P50, P80 and P90 schedule forecasts: schedule risk analysis and Monte Carlo on a construction schedule, worked throughNew

How schedule risk analysis works on a construction schedule: three-point estimates, a Monte Carlo run, P50/P80/P90 finish dates, merge bias, contingency and the tools that do it.10 min readCalculatorTemplate
Scheduling & field

DCMA 14-point schedule assessment: the checks, what they catch, and software that runs them

The DCMA 14-point schedule assessment explained: each check, the threshold usually applied, why it matters, and what to look for in health check software.8 min readCalculatorTemplate

The three-week look-ahead schedule: build it, run it, measure it

How to build and run a three-week look-ahead schedule in construction: pulling work from the CPM schedule, clearing constraints, the weekly meeting, and measuring percent plan complete (PPC).10 min read · 2 diagramsCalculatorTemplate

Construction safety metrics: TRIR, DART, LTIR and EMR, calculated

The construction safety metrics owners and insurers ask for — TRIR, DART and lost-time rates on the 200,000-hour basis, the experience modification rate (EMR) and what it costs — plus leading indicators.11 min read · 2 diagramsCalculatorTemplate

Progress tracking & reality capture8 guides

Seeing what is built: 360 documentation, drones and scanning, progress tracking software compared from each vendor's own site, and what it costs and returns on a job.

Progress tracking & reality capture

Construction progress tracking software: how it works, who makes it, and how to chooseNew

Construction progress tracking software compared: 360 and drone capture, BIM and schedule comparison, Buildots, OpenSpace, Doxel, DroneDeploy and Cupix.9 min readCalculatorTemplate
Progress tracking & reality capture

Reality capture for construction: 360 cameras, drones, laser scanning and what each is forNew

Reality capture for construction compared: 360 camera walks, phones, drone photogrammetry and laser scanning, what each is good for and how to run it.8 min readCalculatorTemplate
Progress tracking & reality capture

360 photo documentation for construction: routes, cadence, privacy and what to captureNew

How to run 360 photo documentation on a construction site: walk routes, cadence, capture before cover-up, privacy, storage and the tools contractors use.7 min readCalculatorTemplate
Progress tracking & reality capture

Buildots vs OpenSpace: what each says it does, and which fits your jobNew

Buildots vs OpenSpace compared from each vendor's own site: capture, BIM and schedule comparison, integrations, pricing basis, and when to pick each one.6 min readCalculatorTemplate
Progress tracking & reality capture

Buildots alternatives and similar startups: four progress tracking tools compared, and when to pick BuildotsNew

Buildots alternatives compared from each vendor's own site: OpenSpace, Doxel, DroneDeploy Progress AI and Cupix. What each does, capture, BIM and pricing.7 min readCalculatorTemplate
Progress tracking & reality capture

OpenSpace alternatives: four reality capture and progress tools compared, and when to pick OpenSpaceNew

OpenSpace alternatives compared from each vendor's own site: Buildots, Doxel, DroneDeploy Progress AI and Cupix. Capture, BIM, schedule and pricing.7 min readCalculatorTemplate
Progress tracking & reality capture

Construction progress tracking cost: the cost model, and the questions to askNew

What construction progress tracking really costs: the subscription basis, capture and review time, hardware, services and the questions to ask.6 min readCalculatorTemplate
Progress tracking & reality capture

Progress tracking ROI: how to work out the return on your own jobNew

How to work out the ROI of construction progress tracking on your own job: over-billing caught, reporting time, earlier warning of delays, with a calculator.6 min readCalculatorTemplate

Data & integrations5 guides

Connecting ERP to project management, migrating cost history without losing a dollar, and setting up a read-only reporting database.

Construction software integration: connecting ERP, project management and field toolsNew

How to connect construction accounting, project management and field software: a system of record per field, the shared keys, sync direction, methods and monitoring.11 min read · 2 diagramsCalculatorTemplate

Procore ERP integration: what syncs with your accounting system, and howNew

How Procore's ERP integration works: the ERP Integrations tool, accounting approval, what syncs (jobs, cost codes, vendors, budgets, commitments, invoices) and a setup checklist.10 min read · 2 diagramsCalculatorTemplate

Autodesk Build cost management: budgets, contracts and the change order chainNew

How cost management works in Autodesk Build (ACC): budgets, contracts, cost items, and the PCO, RFQ, COR, OCO and SCO change order chain — with a worked example and how to report on it.9 min read · 2 diagramsCalculatorTemplate

Construction data migration: move job cost history without losing a dollarNew

How to migrate construction accounting and job cost data: what to move, how much history, cost code crosswalks, month-end cutover, and the tie-outs that prove nothing was lost.13 min read · 3 diagramsCalculatorTemplate

Setting up a construction reporting database in SQL ServerNew

How to set up a SQL Server or Azure SQL reporting copy of construction ERP data: getting data in, a read-only login, naming, indexes, and the checks to run after every load.13 min read · 2 diagramsCalculatorTemplate

Running the business4 guides

Change orders, bid levelling and the KPI scorecard — the commercial habits that decide whether a contractor makes money.

Change order management: stop carrying work nobody has signed for

How contractors manage change orders: PCOs, CORs and CCDs, the real cost of unsigned work in place, the KPIs to track, and how to catch it the week it happens.9 min read · 2 diagramsCalculatorTemplate

Subcontractor bid leveling: find the real low bid

How to level subcontractor bids: a scope checklist, pricing exclusions with plug numbers, alternates and allowances, worked example where the low base bid is not the low bid, and a template.10 min read · 3 diagramsCalculatorTemplate
Running the business

Subcontract review: the clauses to check, and how to find them across a contract set

A subcontract review checklist: retainage, insurance, indemnity, pay terms, notice, changes and flow-down, plus how to search contracts and specs for each.8 min readCalculatorTemplate

Construction KPIs: the 12 financial metrics that actually matter

The construction KPIs that predict trouble: gross margin and fade, CPI, over/under billing, backlog, days sales outstanding, cash low point, labor productivity, change orders, retainage and more — with formulas.10 min read · 1 diagramCalculatorTemplate

Templates & forms17 guides

Free Excel templates for the documents a contractor fills in every week — scope of work, schedule, estimate, budget, bid, change order, RFI, daily report and punch list — each with drop-downs, validation and formulas built in.

Templates & forms

Free construction templates for Excel, Google Sheets and PDFNew

Free construction templates in Excel: schedules, estimates, budgets, bids, proposals, change orders, RFIs, submittals, punch lists, invoices and more.4 min read

Construction scope of work template: what to include, a filled-in example and a free downloadNew

A free construction scope of work template in Excel: inclusions, exclusions, by-others items, allowances and alternates, with a filled-in example and the gaps that cause disputes.8 min read · 1 diagramCalculatorTemplate

Construction schedule template: activities, workday finish dates and a free Excel downloadNew

A free construction schedule template in Excel: activities, durations in workdays, predecessors, calculated finish dates, percent complete, status and days late — with a filled-in example.8 min read · 1 diagramCalculatorTemplate

Punch list template: the fields that get items closed, an example and a free Excel downloadNew

A free construction punch list template in Excel: location, trade, priority, photo, assignee, due date, status, verification, days open and overdue flags — with a filled-in example.7 min read · 1 diagramCalculatorTemplate

Construction estimate template: labor, material, equipment and subs by cost code — free ExcelNew

A free construction estimate template in Excel: quantity, labor hours per unit, rates, material, equipment and subcontract costs by cost code, with markup to price and a worked example.9 min read · 1 diagramCalculatorTemplate

Construction change order form: what it must show, a priced example and a free templateNew

A free construction change order form template in Excel: description, reason, cost lines by type with markup, schedule impact and approval — with a priced example and what gets COs rejected.8 min read · 1 diagramCalculatorTemplate

Construction daily report template: what to record every day, an example and a free downloadNew

A free construction daily report template in Excel: weather, trades and headcount, man-hours, work performed, equipment, deliveries, inspections, delays, safety and photos — with an example.7 min read · 1 diagramCalculatorTemplate

Construction budget template: budget, committed, actual and forecast by cost code — free ExcelNew

A free construction budget template in Excel: original budget, approved changes, committed and actual cost, cost to complete, forecast at completion and variance by cost code — with an example.8 min read · 1 diagramCalculatorTemplate

Construction bid template: base bid, alternates, unit prices and exclusions — free ExcelNew

A free construction bid template in Excel: base bid items, add and deduct alternates, allowances, unit prices and exclusions, with totals and a worked example of how to price the bid.7 min read · 1 diagramCalculatorTemplate

RFI template: how to write a construction RFI, an example and a free form and logNew

A free construction RFI template in Excel: question, drawing reference, proposed solution, response due, cost and schedule impact, answer, days open and overdue flags — with examples.7 min read · 1 diagramCalculatorTemplate

Construction proposal template: scope, price, exclusions and payment schedule — free downloadNew

A free construction proposal template in Excel: scope with inclusions and exclusions, prices, a payment schedule, a valid-until date and a filled-in example.7 min read · 1 diagramCalculatorTemplate

Construction timesheet template: hours by job and cost code, overtime and labor cost — free ExcelNew

A free construction timesheet template in Excel: hours by worker, job and cost code, with regular and overtime and labor cost calculated for payroll.6 min read · 1 diagramCalculatorTemplate

Submittal log template: track every submittal from spec to approval — free ExcelNew

A free construction submittal log template in Excel: spec section, type, responsible sub, submit-by dates, review status, revisions and at-risk flags.6 min read · 1 diagramCalculatorTemplate
Templates & forms

Construction meeting minutes template: decisions, actions and owners, with a free Excel downloadNew

Free construction meeting minutes template in Excel: decisions, actions, owners, due dates and carry-over, with a filled-in example and how to run it.6 min readCalculatorTemplate
Templates & forms

Toolbox talk template: a sign-in record of the topic, the hazards and who attended, with a free Excel downloadNew

Free toolbox talk record in Excel: date, topic, hazards discussed, attendee sign-in and follow-up, with a filled-in example and how to run a short talk.6 min readCalculatorTemplate
Templates & forms

Equipment log template: hours, fuel and service due for each machine, with a free Excel downloadNew

Free construction equipment log in Excel: hours by machine and day, fuel, operator, cost code and service due, with an example and a cost-per-hour calculator.6 min readCalculatorTemplate
Templates & forms

Lien waiver log template: track conditional and unconditional waivers against every payment, with a free Excel downloadNew

Free lien waiver tracking log in Excel: subcontractor, pay application, payment, waiver type, waiver amount and whether it matches, with a filled-in example.6 min readCalculatorTemplate

Free calculators

The formulas from the guides, on your own figures — each shows its working and gives you a link to the result.

CalculatorEstimate at completion (EAC) and cost overrun calculatorEnter budget, cost to date and percent complete to get earned value, CPI, SPI, estimate at completion two ways, variance and TCPI — with the formulas shown.CalculatorOver/under billing calculator (WIP)Percent complete, earned revenue, over- or under-billing, retention and cash position from five numbers — the WIP schedule line, worked out.CalculatorConstruction schedule health checkPaste or upload a P6, Microsoft Project, Excel or CSV activity list and see which activities are behind, over budget or both — read in your browser, nothing uploaded.CalculatorFully burdened labor rate calculator for constructionLoaded labor rate from base wage, burden and fringe, plus the true cost of overtime and double time across a crew — with the formulas shown.CalculatorConstruction markup vs margin calculatorBid price from direct cost, overhead, target margin and bond — and why a 20% markup is only a 16.7% margin.CalculatorChange order pricing calculatorLabor hours and rate, material, equipment and subcontract, with separate self-performed and subcontract markups plus bond — the price to put on the request.CalculatorPay application and retainage calculatorCompleted and stored to date, retainage, earned less retainage, current payment due and balance to finish — the AIA G702 lines, worked out.CalculatorContractor overhead recovery and break-even calculatorOverhead rate, the gross margin and markup you need to cover overhead and profit, and break-even revenue — from four numbers.CalculatorConcrete calculator: cubic yards, bags and costCubic yards with waste, 40/60/80 lb bags, ready-mix truckloads and cost.CalculatorGravel calculator: cubic yards to tonsCubic yards and tons of gravel, crushed stone, road base, sand or topsoil from length, width and depth — with compaction.CalculatorDrywall calculator: sheets, mud, tape and screwsNumber of sheets (4×8, 4×10, 4×12) for walls and ceilings, less doors and windows, plus joint compound, tape and screws.CalculatorRoofing squares calculator: roof area, squares and bundlesRoof area from footprint and pitch, roofing squares with waste, shingle bundles, underlayment rolls and material cost.CalculatorTRIR calculator: TRIR, DART, LTIR and what your EMR costsTRIR, DART rate, LTIR and severity rate on OSHA's 200,000-hour basis, recordables allowed under an owner's limit, and the premium cost of your EMR.CalculatorPaint calculator: gallons, coats and labor hoursWall and ceiling area less doors and windows, gallons by coat and coverage, paint cost, and labor hours at your production rate.CalculatorBrick and block calculator: bricks, concrete blocks and mortarModular, queen and utility brick or 8 and 12 in concrete block per square foot of wall, waste, mortar bags and material cost.CalculatorAsphalt calculator: tons of hot mix, square yards and truckloadsTons of hot mix asphalt from length, width and compacted thickness, with density, waste, square yards, truckloads and material cost.CalculatorRebar weight calculator: pounds, tons and barsWeight in pounds and tons from bar size, length and number of bars, with lap and waste, stock bars and material cost.CalculatorBoard foot calculator: lumber volume and costBoard feet from lumber thickness, width and length, with pieces, waste, cubic feet and cost at your price per board foot.CalculatorStair stringer calculator: risers, treads and stringer lengthNumber of risers and treads, exact riser height, total run, stringer length and angle from the total rise and your tread depth.CalculatorTile and flooring calculator: square feet, waste and boxesRoom area, waste allowance, number of tiles or planks, boxes to order and material cost from the room and the tile size.CalculatorSquare footage calculator: area in square feet, yards and metersAdd two rectangles for an L-shape, deduct openings, and get square feet, square yards, square meters and acres.CalculatorRetaining wall calculator: blocks, caps and gravelCourses, wall blocks and cap blocks, base gravel and drainage backfill in cubic yards, and block cost from the wall size.CalculatorConstruction loan calculator: interest during the build and payment afterInterest during the build from average draws, the interest-only payment and the monthly payment after conversion.

Spreadsheet templates

Every template downloads as an Excel workbook (drop-down lists, date and number validation, formulas filled down, and an Instructions sheet listing what each column captures) or as a CSV for Google Sheets.

construction-ai-tool-shortlist.csv11 columns · from The best construction AI tools (2026)ai-use-case-scorecard.csv11 columns · from AI in construction: where to starttakeoff-accuracy-test.csv10 columns · from AI estimating & takeoffschedule-risk-register.csv10 columns · from AI schedulingsafety-alert-review-log.csv8 columns · from AI safety & progress trackingcontract-risk-clause-checklist.csv9 columns · from AI document reviewchatgpt-prompt-library.csv5 columns · from 30 ChatGPT prompts for contractorsai-pilot-scorecard.csv7 columns · from Construction AI comparedsafety-camera-pilot-log.csv8 columns · from Site safety AI camerasconstruction-intelligence-readiness.csv8 columns · from Construction intelligenceconstruction-tech-stack-inventory.csv10 columns · from The construction tech stackpm-software-evaluation.csv10 columns · from Best construction management softwareconstruction-erp-requirements.csv6 columns · from Accounting software & ERPestimate-vs-actual-by-cost-code.csv10 columns · from Estimating softwaretakeoff-software-trial.csv10 columns · from Construction quantity takeoff softwareschedule-health-check.csv8 columns · from Scheduling softwareconstruction-dashboard-spec.csv8 columns · from Dashboards & BIconstruction-tech-roadmap.csv8 columns · from Tech trends 2026sage-300-cre-wip-columns.csv13 columns · from Sage 300 CRE reportingquickbooks-cost-code-items.csv7 columns · from QuickBooks job costingtrade-kpi-checklist.csv4 columns · from Construction software by tradegc-job-review.csv12 columns · from General contractor softwareelectrical-labor-productivity.csv9 columns · from Electrical contractor softwareplumbing-phase-tracker.csv8 columns · from Plumbing softwaremechanical-equipment-log.csv9 columns · from HVAC and mechanical contractor softwareconcrete-pour-log.csv10 columns · from Concrete contractor softwareroofing-job-margin.csv9 columns · from Roofing contractor softwaresitework-production-log.csv9 columns · from Excavation and sitework contractor softwaredrywall-weekly-production.csv8 columns · from Drywall and interiors contractor softwarehome-builder-house-budget.csv11 columns · from Home builder softwareremodel-job-tracker.csv12 columns · from Remodeling contractor softwaredeck-job-tracker.csv11 columns · from Deck builder softwareunit-price-quantity-tracker.csv12 columns · from Civil and utility contractor softwareflooring-job-tracker.csv12 columns · from Flooring contractor softwarepainting-production-log.csv11 columns · from Painting contractor softwarekitchen-bath-selections-tracker.csv11 columns · from Kitchen and bath remodeler project management softwarecountertop-job-tracker.csv11 columns · from Countertop installer softwareplastering-production-log.csv10 columns · from Plastering contractor softwareelevator-install-tracker.csv10 columns · from Elevator contractor softwareeac-forecast-template.csv10 columns · from Job cost forecasting (EAC)buyout-log.csv9 columns · from Committed cost in constructionearned-value-tracker.csv12 columns · from Earned value, with one joblabor-productivity-tracker.csv9 columns · from Labor forecastingcost-code-list-template.csv6 columns · from Construction cost codescost-management-by-code.csv9 columns · from Construction cost management softwarewip-schedule-template.csv9 columns · from The WIP scheduleschedule-of-values-template.csv11 columns · from Schedule of valuesconstruction-invoice-template.csv11 columns · from Construction invoice templateg703-continuation-sheet.csv10 columns · from AIA G702 / G703, line by lineretainage-tracker.csv10 columns · from Retainage, and getting it backlien-waiver-log.csv11 columns · from Lien waivers: the four types13-week-cash-flow.csv10 columns · from 13-week cash flow forecastcpm-schedule-worksheet.csv10 columns · from Critical path methodthree-point-estimate-sheet.csv8 columns · from Schedule risk analysis (P50/P80)schedule-quality-check-log.csv9 columns · from DCMA 14-point schedule assessmentthree-week-look-ahead.csv10 columns · from 3-week look-aheadsafety-metrics-log.csv9 columns · from Safety metrics (TRIR, EMR)progress-tracking-vendor-scorecard.csv10 columns · from Construction progress tracking softwarereality-capture-plan.csv8 columns · from Reality capture for construction360-walk-log.csv8 columns · from 360 photo documentation for constructionbuildots-vs-openspace-vendor-scorecard.csv10 columns · from Buildots vs OpenSpacebuildots-alternatives-vendor-scorecard.csv10 columns · from Buildots alternatives and similar startupsopenspace-alternatives-vendor-scorecard.csv10 columns · from OpenSpace alternativesprogress-tracking-cost-sheet.csv9 columns · from Construction progress tracking costprogress-tracking-roi-sheet.csv9 columns · from Progress tracking ROIintegration-field-map.csv7 columns · from Construction software integrationprocore-erp-tieout.csv7 columns · from Procore ERP integrationacc-change-log.csv9 columns · from Autodesk Build cost managementcost-code-crosswalk.csv6 columns · from Construction data migrationreporting-load-checks.csv5 columns · from Setting up a construction reporting database in SQL Serverchange-order-log-template.csv11 columns · from Change order managementbid-leveling-sheet.csv8 columns · from Bid levelingsubcontract-clause-reconciliation.csv8 columns · from Subcontract reviewconstruction-kpi-scorecard.csv10 columns · from The 12 KPIs that matterscope-of-work-template.csv12 columns · from Construction scope of work templateconstruction-schedule-template.csv13 columns · from Construction schedule templatepunch-list-template.csv15 columns · from Punch list templateconstruction-estimate-template.csv16 columns · from Construction estimate templatechange-order-form.csv17 columns · from Construction change order formconstruction-daily-report-template.csv18 columns · from Construction daily report templateconstruction-budget-template.csv12 columns · from Construction budget templateconstruction-bid-template.csv8 columns · from Construction bid templaterfi-template.csv16 columns · from RFI templateconstruction-proposal-template.csv8 columns · from Construction proposal templateconstruction-timesheet-template.csv11 columns · from Construction timesheet templatesubmittal-log-template.csv14 columns · from Submittal log templatemeeting-minutes-template.csv10 columns · from Construction meeting minutes templatetoolbox-talk-record.csv12 columns · from Toolbox talk templateequipment-log-template.csv13 columns · from Equipment log templatelien-waiver-log-template.csv10 columns · from Lien waiver log template

Nothing matches that. Try the glossary — 79 terms, each linked to its guide.

Construction finance glossary79 terms — EAC, CPI, retainage, WIP, fade and the rest — in one page.Open the glossary →

Common questions

Straight answers on the guides, the tools and where AI fits.

What are the best construction AI tools?

It depends on the job to be done. The shortlist for takeoff, estimating, scheduling, progress tracking, safety and document review — with what each is good at and what it costs — is in the best construction AI tools (2026). Test any of them on a job you have already finished, where you know the right answer.

How do you forecast a construction job’s cost at completion?

Forecast cost to date plus the estimate to complete, or budget divided by the cost performance index (CPI). The job cost forecasting guide works both through, and the free cost overrun calculator runs the arithmetic on your own numbers.

What is the difference between construction accounting software and project management software?

Accounting software and ERP hold the money — job cost, payroll, AP/AR and the WIP schedule. Project management software runs the work — drawings, RFIs, submittals, daily logs and the schedule. They join on the job number and the cost code; see accounting software & ERP and project management software.

Are the calculators and templates really free?

Yes. Every calculator, converter and spreadsheet template on this page runs in your browser with no sign-up, and nothing you enter is uploaded.

How do you choose construction software?

Start from the job to be done rather than the feature list, shortlist two or three tools, and test each on a job you have already finished. The construction tech stack guide shows how the systems fit together.

Every guide, running on your own jobs

Constructelligence reads your ERP, project and field systems read-only and does all of this weekly. Try it on the demo portfolio.

Try the demoJoin the private beta