Drywall calculator: sheets, mud, tape and screws
Work out how much drywall a room or a whole job needs. Enter the wall length, height, ceiling area and openings, choose the sheet size you hang, and get the sheets to order with waste — plus the joint compound, tape and screws that go with them.
Drywall: sheets, mud, tape & screws
Enter the room or the total wall length, the height and the openings, and get the board area, the number of sheets in the size you hang, and the finishing materials to order with it.
The room
Result
Board area = wall length × height + ceiling − 21 sq ft per door − 15 sq ft per window. Sheets = board area × (1 + waste %) ÷ sheet area, rounded up. Finishing materials use common planning rates per 1,000 sq ft of board: about 370 ft of paper tape, 140 lb (≈ 2.3 boxes) of ready-mixed all-purpose compound for a level 4 finish, and about 1,000 screws. Your finisher’s own rates are better.
How to use it
- Enter the total wall length (the room’s perimeter) and the wall height.
- Enter the ceiling area, or 0 to leave the ceiling out.
- Enter the number of doors and windows to deduct.
- Choose the sheet size and waste allowance, and read the sheets and finishing materials.
A worked example
Questions
How do you calculate how many sheets of drywall you need?
Add the wall area (perimeter × height) and the ceiling area, subtract doors and windows, add 10–15% for waste, and divide by the sheet area: 32 sq ft for 4 × 8, 48 sq ft for 4 × 12.
How many sheets of drywall for a 12 × 12 room?
With 8 ft walls, the walls are 384 sq ft and the ceiling 144 sq ft — 528 sq ft before openings. That is about 19 sheets of 4 × 8 with 12% waste, before deducting doors and windows.
How much joint compound do I need?
A common planning figure is about 140 lb of ready-mixed all-purpose compound per 1,000 sq ft of board for a level 4 finish — a little over two 4.5-gallon boxes. Higher finish levels use more.
Should I use 4 × 8 or 4 × 12 drywall?
Longer sheets mean fewer butt joints, and butt joints take the most finishing time. Crews hanging 8 ft walls horizontally often prefer 12 ft sheets when they can get them into the room.