Rebar weight calculator: pounds, tons and bars

Work out how much rebar weighs. Pick the bar size, enter how many bars and how long each is, and get the total weight in pounds and tons, the linear feet with lap and waste, the stock bars to order and the cost.

Free, no sign-upRuns in your browser — nothing is sent anywhereFormulas shownCopy a link to share your numbers
Tool 17

Rebar weight: pounds, tons & bars

Pick the bar size, enter how many bars and how long, and get the weight in pounds and tons, the linear feet with lap and waste, and the number of stock bars.

The bars

Result

Linear feet = bars × length × (1 + lap and waste). Weight = linear feet × pounds per foot for the bar size. Rebar is sold by weight, so the weight drives the cost; stock bars = linear feet ÷ stock length, rounded up.

How to use it

  1. Pick the bar size (#3 to #11).
  2. Enter the length of each bar and how many there are.
  3. Add a lap and waste allowance, and the stock bar length you buy.
  4. Enter your price per pound and read the weight, tons, stock bars and cost.

A worked example

60 #4 bars at 20 ft is 1,200 ft. With 10% lap and waste that is 1,320 ft; at 0.668 lb per foot the order weighs 882 lb (0.44 tons), 66 stock bars of 20 ft, and about $749 at $0.85 a pound.

Rebar weight per foot by bar size

BarNominal diameterWeight, lb per ft
#33/8 in0.376
#41/2 in0.668
#55/8 in1.043
#63/4 in1.502
#77/8 in2.044
#81 in2.670
#91-1/8 in3.400
#101-1/4 in4.303
#111-3/8 in5.313

The bar number is the diameter in eighths of an inch, so a #4 is 4/8 in. Weights are the standard nominal figures for deformed bar; a mill's actual weight varies slightly.

What the calculator leaves out

Tie wire, chairs, bar supports and mechanical couplers, and the laps the detailer specifies for each bar. Take the bar lengths and quantities from the bar list on the structural drawings, and add the lap lengths they show.

Quantities are half the job. The trade guide covers what to track once the material is ordered — unit costs, waste against the estimate, and the software that shows them.
Read: Software for concrete contractors →

Questions

How do you calculate the weight of rebar?

Multiply the total length in feet by the weight per foot for the bar size. A #4 bar weighs 0.668 lb per foot, so 100 ft weighs 66.8 lb.

How much does a #4 rebar weigh?

0.668 lb per foot, which is about 13.4 lb for a 20 ft bar. A #5 weighs 1.043 lb per foot and a #3 0.376 lb per foot.

How many 20 ft bars are in a ton of rebar?

A ton is 2,000 lb, so a #4 at 13.4 lb per 20 ft bar gives about 150 bars; a #5 at 20.9 lb gives about 96.

How much extra rebar should I order?

Allow for laps and cut-offs on top of the length shown on the drawings. Ten percent is a common starting point for plain runs, more for heavy detailing; use the detailer's bar list where there is one.