Square footage calculator: area in square feet, yards and meters
Work out the area of a room, slab or lot. Enter one rectangle or two for an L-shaped space, deduct anything that should not count, and get the area in square feet, square yards, square meters and acres.
Square footage: area of one or two rectangles
Enter one or two rectangles and any area to deduct, and get the total square feet, square yards, square meters and acres.
The space
Result
Area = (length 1 × width 1) + (length 2 × width 2) − deductions. One square yard is 9 square feet, one square meter is 10.764 square feet and one acre is 43,560 square feet.
How to use it
- Enter the length and width of the first rectangle in feet.
- For an L-shape or addition, enter a second rectangle.
- Enter any area to deduct, such as a stair opening.
- Read the area in square feet, yards, meters and acres.
A worked example
Area conversions
| From | To | Multiply by |
|---|---|---|
| Square feet | Square yards | 1 ÷ 9 (0.1111) |
| Square feet | Square meters | 0.0929 |
| Square meters | Square feet | 10.764 |
| Square feet | Acres | 1 ÷ 43,560 |
| Square feet | Roofing squares | 1 ÷ 100 |
Triangles, circles and trapezoids
Split odd shapes into rectangles and triangles. A triangle is half its base times its height; a circle is π × radius²; a trapezoid is the average of its two parallel sides times its height. Calculate each part and add them, or use this calculator for the rectangular parts.
Questions
How do you calculate square footage?
Multiply length by width in feet. For an L-shaped space, calculate each rectangle and add them, then subtract anything that should not count.
How many square feet are in a square yard?
Nine. Divide square feet by 9 to get square yards.
How many square feet are in an acre?
43,560.
How do you convert square feet to square meters?
Multiply by 0.0929. A 1,000 sq ft space is about 92.9 square meters.
More free calculators
Want this on your live data, every morning?
These tools are manual. The dashboard does the same arithmetic across every job, every company and every week — plus the money-at-risk view, the audit findings and the overrun radar. Join the private beta and we will connect it to the systems you already run.