Board foot calculator: lumber volume and cost
Work out how many board feet a lumber order is. Enter the thickness and width in inches, the length in feet and how many pieces, and get the board feet with waste, the cubic feet and the cost at your price per board foot.
Board feet: lumber volume & cost
Enter the thickness, width and length of each piece and how many there are, and get the board feet, the cost at your price per board foot and the cubic feet.
The lumber
Result
One board foot is a piece 1 in thick, 12 in wide and 12 in long: 144 cubic inches. Board feet = thickness (in) × width (in) × length (ft) ÷ 12, times the number of pieces. Lumber is sold by its nominal size, so a 2×10 is counted as 2 × 10.
How to use it
- Enter the nominal thickness and width in inches, and the length in feet.
- Enter how many pieces there are.
- Add a waste allowance.
- Enter your price per board foot and read the board feet and cost.
A worked example
Board feet by common size
| Piece | Board feet per 8 ft | Per 12 ft | Per 16 ft |
|---|---|---|---|
| 2×4 | 5.33 | 8.00 | 10.67 |
| 2×6 | 8.00 | 12.00 | 16.00 |
| 2×8 | 10.67 | 16.00 | 21.33 |
| 2×10 | 13.33 | 20.00 | 26.67 |
| 2×12 | 16.00 | 24.00 | 32.00 |
Each is thickness × width × length ÷ 12 using the nominal size. Framing lumber is usually priced by the piece or by the thousand board feet (MBF); hardwood is priced by the board foot.
Nominal versus actual size
A 2×10 is sold as 2 × 10 inches but measures about 1½ × 9¼ after it is dried and planed. Board feet are counted on the nominal size, which is why a board foot does not equal a full 144 cubic inches of finished wood.
Questions
How do you calculate board feet?
Thickness in inches times width in inches times length in feet, divided by 12. A 2×10 that is 16 ft long is 26.67 board feet.
How many board feet are in a 2×4?
A 2×4 is 0.667 board feet per foot of length: 5.33 for an 8 ft stud and 10.67 for a 16 ft board.
What is a board foot?
A unit of lumber volume equal to 144 cubic inches, that is a piece 1 in thick, 12 in wide and 12 in long.
What is MBF?
One thousand board feet. Framing lumber is often quoted per MBF, so a price of $1,100 per MBF is $1.10 per board foot.
More free calculators
Want this on your live data, every morning?
These tools are manual. The dashboard does the same arithmetic across every job, every company and every week — plus the money-at-risk view, the audit findings and the overrun radar. Join the private beta and we will connect it to the systems you already run.