Stair stringer calculator: risers, treads and stringer length

Lay out a stair. Enter the total rise and the riser height you are aiming for, and get the number of equal risers, the exact riser height, the treads, the total run, the length of the stringer and the angle.

Free, no sign-upRuns in your browser — nothing is sent anywhereFormulas shownCopy a link to share your numbers
Tool 19

Stair stringer: risers, treads & length

Enter the total rise and your target riser height, and get the number of risers and treads, the exact riser height, the total run, the stringer length and the angle.

The stairs

Result

Risers = total rise ÷ target riser, rounded to a whole number. Riser height = total rise ÷ risers, so every riser is equal. Treads = risers − 1 (the floor above is the last step). Total run = treads × tread depth. Stringer length = √(rise² + run²).

How to use it

  1. Measure the total rise from finished floor to finished floor.
  2. Enter a target riser height; the calculator rounds to a whole number of equal risers.
  3. Enter the tread depth.
  4. Read the risers, treads, run, stringer length and angle.

A worked example

A 108 in rise at a target 7.5 in riser is 14.4, so use 14 equal risers of 7.714 in and 13 treads. At 10 in treads the run is 130 in (10.8 ft), the stringer is 14.1 ft long and the angle is 39.7°.

Stair rules to check

ItemCommon US residential figure
Maximum riser height7¾ in
Minimum tread depth10 in
Variation between risersNo more than 3/8 in in a flight
HeadroomAt least 6 ft 8 in

These are the figures in the International Residential Code; local codes differ and commercial stairs follow stricter limits. Check with your building department before you cut.

Marking the stringer

Mark the riser and tread on a framing square, step it along the board, and shorten the bottom of the stringer by the thickness of one tread so the first riser matches the others. A common layout is three stringers for a 36 in wide stair.

Quantities are half the job. The trade guide covers what to track once the material is ordered — unit costs, waste against the estimate, and the software that shows them.
Read: the guide →

Questions

How do you calculate stair stringers?

Divide the total rise by a target riser height and round to a whole number of risers. Divide the total rise by that number for the actual riser height. Treads equal risers minus one, and the stringer length is the square root of rise squared plus run squared.

How many risers do I need for a 9 ft rise?

A 108 in rise at 7.5 in per riser needs 14 risers of 7.71 in.

What is the maximum riser height?

The US model residential code allows up to 7¾ in. Local code governs, and commercial stairs are stricter.

Why is the last tread missing?

The floor above acts as the top step, so a flight has one more riser than it has treads.