Paint calculator: gallons, coats and labor hours
Work out how much paint a room, a floor or a whole building needs. Enter the wall perimeter and height, the ceiling area, doors and windows and the number of coats, and get gallons of wall and ceiling paint, the cost, and — for contractors — the labor hours at your own production rate.
Paint: gallons, coats & labor hours
Enter the room or area — wall perimeter and height, ceiling area, openings — and the coats, and get gallons of wall and ceiling paint, the cost, and the labor hours at your production rate.
The area
Result
Wall area = perimeter × height − 21 sq ft per door − 15 sq ft per window. Gallons = area × coats ÷ coverage, rounded up separately for walls and ceilings (they are usually different products). Labor hours = (wall + ceiling area) × coats ÷ production rate — painting only; add prep, masking and access separately.
How to use it
- Measure the total length of the walls being painted and their height.
- Enter the ceiling area if ceilings are included, and count doors and windows.
- Set coats and the coverage from the product data sheet — less on rough, porous or unprimed surfaces.
- Enter your price per gallon and your crew's production rate for hours.
A worked example
Coverage, coats and primer
Coverage on the can assumes a smooth, sealed surface. New drywall, bare plaster, rough masonry and dark-to-light color changes all take more: prime new drywall first (its own coat at the primer's coverage), and allow a third coat for strong color changes. Textured and porous surfaces can cut coverage well below the label — the product data sheet gives the range.
For contractors: hours, not just gallons
Paint is a small share of a painting job's cost; labor is most of it. The useful number is square feet per hour per coat, by surface, from your own finished jobs — the painting contractor software guide covers tracking it and the margin it decides.
Questions
How much paint do I need for a room?
Wall area (perimeter × height, less about 21 sq ft per door and 15 per window) times the number of coats, divided by the coverage per gallon — commonly around 350 to 400 sq ft per gallon per coat on smooth, primed walls. Round up for each product separately.
How many coats of paint do I need?
Two finish coats is the usual standard for a repaint or color change. New drywall needs a primer coat first; a strong color change can need a third coat.
How much does a gallon of paint cover?
Manufacturers' data sheets commonly state about 350 to 400 sq ft per gallon per coat on smooth, sealed surfaces, and less on rough, porous or unprimed ones.
How long does it take to paint a room?
Divide the area times coats by a production rate — square feet an hour per coat for that surface — then add prep, masking, cutting in and drying time. Contractors use their own rates from finished jobs.
More free calculators
Want this on your live data, every morning?
These tools are manual. The dashboard does the same arithmetic across every job, every company and every week — plus the money-at-risk view, the audit findings and the overrun radar. Join the private beta and we will connect it to the systems you already run.