Tile and flooring calculator: square feet, waste and boxes
Work out how much tile or flooring to buy. Enter the room and the size of the tile or plank, and get the area with waste, the number of pieces, the boxes to order and the cost.
Tile & flooring: area, waste & boxes
Enter the room and the tile or plank size, and get the area with waste, the number of pieces, the boxes to order and the cost.
The room
Result
Area = length × width. Order area = area × (1 + waste). Pieces = order area × 144 ÷ (tile width × tile length). Boxes = order area ÷ square feet per box, rounded up, because flooring is sold by the box.
How to use it
- Measure the room length and width in feet.
- Enter the tile or plank size in inches.
- Set a waste allowance for cuts and breakage.
- Enter the square feet per box and the price, and read the boxes and cost.
A worked example
How much waste to allow
| Layout | Typical waste |
|---|---|
| Straight lay, simple room | About 10% |
| Diagonal | About 15% |
| Herringbone or patterned | 15% to 20% |
| Large-format tile in a small room | Often more, because each cut wastes more |
These are planning figures, not rules. A room with many corners, closets and angles wastes more than a plain rectangle; ask the installer to estimate from the layout.
Measuring an irregular room
Split an L-shaped or notched room into rectangles, calculate each and add them. Use the square footage calculator to total several rectangles and deduct fixed items such as a tub or an island.
Questions
How do you calculate how much tile you need?
Multiply the room length by the width to get square feet, add waste, then divide by the area of one tile. Round up, and buy by the box.
How much extra tile should I buy?
About 10% for a straight lay and 15% or more for diagonal or patterned layouts, to cover cuts, breakage and a spare.
How many tiles are in a box?
It varies by product, so use the square feet per box printed on the carton; this calculator takes that figure and rounds the boxes up.
How do you convert tile size to square feet?
Multiply width by length in inches and divide by 144. A 12 × 24 in tile is 288 sq in, which is 2 sq ft.
More free calculators
Want this on your live data, every morning?
These tools are manual. The dashboard does the same arithmetic across every job, every company and every week — plus the money-at-risk view, the audit findings and the overrun radar. Join the private beta and we will connect it to the systems you already run.