The formula
A worked example
An EMR of 1.25 on the same base would cost $250,000, so a poor safety record shows up directly in cost and in prequalification.
How to read it
The rating bureau calculates the EMR from reported claims over a rolling period. Check each claim for accuracy: a wrongly coded claim raises the rate.
Why it matters, and where it goes wrong
EMR turns a safety record into a premium. Each tenth of a point on a large payroll is real money, and owners also use it to prequalify contractors.
- Not reviewing each claim on the experience rating worksheet for errors.
- Letting old claims run open longer than needed.
- Reading the figure as the injury rate; it measures cost of claims, not frequency.
Go deeper
The full method, with more worked figures, is in the Construction safety metrics: TRIR, DART, LTIR and EMR, calculated guide. To run it on your own numbers, use the TRIR and DART calculator.
Related terms
See it on real-looking numbers
Constructelligence calculates this every week for every job, read-only, from your own systems.
Try the demoJoin the private betaFrequently asked questions
What is a good EMR?
Below 1.0 means losses are better than expected for the company's size and trade. Many owners prequalify at 1.0 or lower.
How does EMR affect cost?
It multiplies the workers' compensation premium, so an EMR of 0.80 cuts the premium by 20% against 1.00, and 1.25 raises it by 25%.