- Most progress tracking vendors do not publish prices; OpenSpace states an ACV basis.
- The subscription is one of five costs: add capture, review, hardware and setup.
- A managed capture service moves cost from your time to the subscription.
- Total it per job and compare with what the job is at risk of losing.
The five parts of the cost
| Part | What drives it | Ask |
|---|---|---|
| Subscription | Projects, area, construction volume or cameras | What is the price based on, and what happens if the job grows? |
| Capture labor | Who walks or flies, how often, how long | Is capture a service you provide, or our time? |
| Review time | Who checks the output and acts on it | How long does a weekly review take on a job like ours? |
| Hardware | Cameras, mounts, drones | Is hardware included, leased or ours to buy? |
| Setup and exit | Model and schedule preparation, integration, export | What does onboarding need from us, and how do we export everything at the end? |
What vendors say about their pricing
- OpenSpace: no figure; its pricing page says pricing “is based on your annual construction volume (ACV)”, by quote.
- Buildots: no pricing published; its /pricing address returned a 404.
- DroneDeploy Progress AI: DroneDeploy's pricing page shows other plans but no Progress AI price.
- Doxel and Cupix: no price shown on the pages read.
- For safety cameras, Intenseye's pricing page says “one annual subscription per connected camera”, by quote.
Last verified 6 November 2026 against each vendor’s own website: OpenSpace, Buildots, DroneDeploy Progress AI, Doxel, Cupix, Intenseye. Vendors change products often; check the source before relying on any detail here.
Totalling your own quote
Put the subscription quote into the calculator with your own capture and review hours. Capture labor is often the part that surprises people: two hours a week for forty weeks is eighty hours of someone's time, whoever carries the camera. If the vendor captures for you, that line goes to zero and the subscription usually rises. Compare the total with the value side in progress tracking ROI.
Next: put a number on it
Cost per job only means something next to what the job is at risk of losing. Three places to go from here:
- The cost side. The cost overrun calculator turns percent complete and cost to date into a forecast at completion.
- How AI is tested. ConstructBench is our benchmark for AI on construction work: tasks with one right answer, graded field by field.
- See it on a job. The Constructelligence demo shows a sample portfolio forecast weekly from cost, commitments and hours.
9 columns: 9 you fill in. In the Excel version, 7 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Vendor | Text | Vendor or subcontractor name as it appears in your vendor master. |
| Pricing basis | Text | Free text. |
| Quote ($) | Amount ($) | Enter the amount in dollars. |
| Capture hours / week | Number | Enter a number. |
| Review hours / week | Number | Enter a number. |
| Weeks | Number | Enter a number. |
| Hardware ($) | Amount ($) | Enter the amount in dollars. |
| Setup ($) | Amount ($) | Enter the amount in dollars. |
| Total | Amount ($) | Enter the amount in dollars. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
How much does construction progress tracking software cost?
Most vendors do not publish prices. OpenSpace says its pricing is based on annual construction volume; Buildots publishes none. Add capture labor, review time, hardware and setup to the subscription quote to get the real cost on a job.
How is reality capture software priced?
Commonly by project, area, construction volume or connected camera, with capture services, hardware and integrations bundled differently by each vendor. Ask what the price is based on and what is included before comparing quotes.
What hidden costs come with progress tracking?
The time to capture every week, the time to review the output, cameras or drones if not included, preparing a model and schedule the tool can use, and exporting your data at the end.
Related guides
More in Progress tracking & reality capture
- Reality capture for construction: 360 cameras, drones, laser scanning and what each is for
- 360 photo documentation for construction: routes, cadence, privacy and what to capture
- Buildots alternatives and similar startups: four progress tracking tools compared, and when to pick Buildots
- OpenSpace alternatives: four reality capture and progress tools compared, and when to pick OpenSpace