- Four capture methods: 360° walks, phones, drones and laser scans, each for a different job.
- Capture before cover-up is the record that pays for itself first.
- Most jobs combine frequent interior 360° walks with drone flights outside.
- Plan storage, privacy and export before the first walk.
The four capture methods
| Method | What it records | Best for | Limits |
|---|---|---|---|
| 360° camera walk | Panoramic images placed on the plans | Weekly interior documentation and progress | Not a precise measurement |
| Phone photos and video | Located photos, issues, punch items | Specific items, quickly, by anyone | Coverage depends on who remembered |
| Drone photogrammetry | Orthophotos, surface models, stockpile volumes | Sitework, earthwork, roofs, large sites | Outdoor only; airspace rules apply |
| Laser scanning (LiDAR) | A dense, measured point cloud | As-builts, deviation checks, prefabrication fit | Slower, specialist, large files |
Most jobs end up with two: frequent 360° walks inside and drone flights outside, with scanning for specific checks.
How often, and when
- Weekly 360° walks through active areas give a usable progress record.
- Before cover-up: walls before board, ceilings before tiles, slabs before pour. This is the capture that pays for itself the first time someone asks what is behind a finished wall.
- At milestones for drone flights: mass excavation, foundations, topping out, envelope.
- When fit matters for laser scans: before prefabricated MEP or curtain wall is fabricated to existing conditions.
What contractors use it for
- Progress: percent complete for the schedule update and the pay application. See progress tracking software.
- Disputes and claims: a dated record of what was installed, when, and the conditions found.
- Coordination: comparing as-built with the model before the next trade builds on it.
- Handover: a visual record of what is inside the walls for the owner's facilities team.
- Remote review: owners, designers and executives walking the site from the office.
Tools, in their own words
| Vendor | What its site says | Capture |
|---|---|---|
| OpenSpace | Describes itself as “the Visual Intelligence Platform for the built world”, with progress tracking in OpenSpace Track. | “Photos, videos, voice notes, 360° walks, drone flights”, plus walk and pilot services. |
| Cupix | “Turn 360° video into as-built 4D intelligence with our digital twin platform.” | Primarily 360° video walkthroughs. |
| DroneDeploy Progress AI | “Automated construction progress tracking from drone and 360 data.” | Drone flights and 360 walkthroughs: “walk or fly your site as usual”. |
| Doxel | “Automated progress tracking to build faster.” | “The 360 camera mounted to a hard hat captures everything.” |
Last verified 6 November 2026 against each vendor’s own website: OpenSpace, Cupix, DroneDeploy Progress AI, Doxel. Vendors change products often; check the source before relying on any detail here.
Keeping the data usable
Reality capture creates a lot of files. Decide up front: where captures are stored and for how long (match your records retention), who can see them, how people and screens are blurred, and how you export everything at the end of the job. A capture you cannot find or open in five years is not a record.
Next: put a number on it
Seeing the site is the start; knowing what it means for cost and billing is the rest. Three places to go from here:
- The cost side. The cost overrun calculator turns percent complete and cost to date into a forecast at completion.
- How AI is tested. ConstructBench is our benchmark for AI on construction work: tasks with one right answer, graded field by field.
- See it on a job. The Constructelligence demo shows a sample portfolio forecast weekly from cost, commitments and hours.
8 columns: 8 you fill in. In the Excel version, 2 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Area | Text | Free text. |
| Method | Text | Free text. |
| Cadence | Text | Free text. |
| Before cover-up date | Date | Enter the date. |
| Who captures | Text | Free text. |
| Stored where | Amount ($) | Enter the amount in dollars. |
| Retention | Text | Free text. |
| Notes | Text | Anything that explains the row; free text. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What is reality capture in construction?
Recording a site's actual conditions as imagery or a measured 3D point cloud, using 360° cameras, phones, drones or laser scanners, so it can be viewed, measured and compared with the design remotely.
What is the difference between 360 photos and laser scanning?
A 360° walk records panoramic images placed on the plans: quick, cheap and good for frequent documentation, but not a precise measurement. A laser scan records a dense, measured point cloud: slower and specialist, used for as-builts and deviation checks where millimetres matter.
When should a contractor capture the site?
Weekly in active areas, always before work is covered up, at major milestones for drone flights, and before prefabricated work is built to existing conditions.
Related guides
More in Progress tracking & reality capture
- Buildots vs OpenSpace: what each says it does, and which fits your job
- Buildots alternatives and similar startups: four progress tracking tools compared, and when to pick Buildots
- OpenSpace alternatives: four reality capture and progress tools compared, and when to pick OpenSpace
- Construction progress tracking cost: the cost model, and the questions to ask
- Progress tracking ROI: how to work out the return on your own job