- Buildots centres on progress against BIM and schedule, with managed captures.
- OpenSpace centres on visual documentation across capture methods, with progress tracking.
- Neither publishes a price.
- Pilot both on the same job with the same questions.
Side by side, from each vendor's site
| Vendor | What its site says | Capture | Compares against | Integrations | Pricing |
|---|---|---|---|---|---|
| Buildots | Describes itself as “construction intelligence to power your whole operation” and says it lets you “see what’s built and when compared to your plan”. | Offers “fully managed site captures by Buildots” (its Capture Services); the homepage does not name a device. | BIM and schedule: “connect your BIM, schedule, site data, and workforce insights into one coordinated system”. | None named on the homepage. | No price published (buildots.com/pricing returned 404). |
| OpenSpace | Describes itself as “the Visual Intelligence Platform for the built world”, with progress tracking in OpenSpace Track. | “Photos, videos, voice notes, 360° walks, drone flights”, plus walk and pilot services. | BIM coordination (“compare design and site conditions”) and planned against actual progress through a schedule integration. | Procore, Autodesk and Revizto connections are listed on its site. | No figure: pricing “is based on your annual construction volume (ACV)”, by quote. |
Last verified 6 November 2026 against each vendor’s own website: Buildots, OpenSpace. Vendors change products often; check the source before relying on any detail here.
When to pick each
Pick Buildots if you have a BIM model and a schedule you trust, want progress measured against both as the main output, and want captures handled as a managed service.
Pick OpenSpace if you want visual documentation on many jobs from 360° walks, drones and phones, with BIM coordination and progress tracking available, and your team works in Procore or Autodesk.
Consider both on a large job where the documentation record and plan-based progress measurement are separate needs, but check the overlap before paying twice.
How to decide: the same job, the same questions
- Pilot both on comparable areas of a live job for the same weeks.
- Compare each tool's percent complete with your superintendent's, area by area.
- Record who captured and how long it took, every week.
- Check where the output goes: schedule update, pay application, owner report.
- Ask both the same pricing questions, in writing.
The scorecard template has the columns.
Pricing
Neither publishes a price. Buildots' pricing address returned a 404 on 6 November 2026; OpenSpace's pricing page says its pricing is based on annual construction volume, by quote. The cost guide lists what to ask and the costs outside the subscription.
Next: put a number on it
Progress you can see is only half the question; the other half is whether the job is still making money. Three places to go from here:
- The cost side. The cost overrun calculator turns percent complete and cost to date into a forecast at completion.
- How AI is tested. ConstructBench is our benchmark for AI on construction work: tasks with one right answer, graded field by field.
- See it on a job. The Constructelligence demo shows a sample portfolio forecast weekly from cost, commitments and hours.
10 columns: 7 you fill in and 3 picked from drop-down lists, so every row uses the same values. In the Excel version, the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Vendor | Text | Vendor or subcontractor name as it appears in your vendor master. |
| Capture method | Text | Free text. |
| Who captures | Text | Free text. |
| Compares to BIM? | Drop-down | Options: Yes / No. |
| Compares to schedule? | Drop-down | Options: Yes / No. |
| Integrations you need | Text | Free text. |
| Pricing basis | Text | Free text. |
| Pilot job | Text | Free text. |
| Reviewer agrees with % complete? | Drop-down | Options: Yes / No. |
| Notes | Text | Anything that explains the row; free text. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What is the difference between Buildots and OpenSpace?
Both turn site captures into progress information. Buildots' site centres on measuring what is built against your BIM and schedule, with managed site captures; OpenSpace's centres on a visual intelligence platform across 360° walks, drones and phones, with BIM coordination and progress tracking, and lists Procore, Autodesk and Revizto connections.
Is Buildots or OpenSpace cheaper?
Neither publishes a price, so there is no public answer. OpenSpace says its pricing is based on annual construction volume; ask both for written quotes on the same job and add capture and review time.
Can you use Buildots and OpenSpace together?
Some large jobs use one tool for the documentation record and another for plan-based progress. Check how much the two overlap on your job before paying for both.
Related guides
More in Progress tracking & reality capture
- Reality capture for construction: 360 cameras, drones, laser scanning and what each is for
- 360 photo documentation for construction: routes, cadence, privacy and what to capture
- Construction progress tracking cost: the cost model, and the questions to ask
- Progress tracking ROI: how to work out the return on your own job