- The return comes from billing matched to work, reporting time and earlier warning.
- Over-billing recovered is cash and risk, not profit.
- Count reporting time only if the old walk actually stops.
- Re-run the numbers with what a pilot actually found.
Where the return comes from
- Billing that matches the work. Subcontractor pay applications checked against verified progress, and your own billing kept level with earned revenue. See over- and under-billing.
- Reporting time. Hours spent walking, estimating percent complete and writing it up each week.
- Earlier warning. An area falling behind seen in week three rather than at the monthly update, while there is still time to add a crew.
A worked example
Illustrative figures for one job; use your own. $2.4M billed to date, 40 weeks left, six hours a week spent walking and reporting progress at $75 an hour, and verified progress showing subcontractor billing running 3% ahead of the work:
The over-billing is not profit: it is cash paid before work was done, recovered on the next pay application instead of at closeout. Its value is the risk of paying for work that is never completed, and the cash it ties up. Earlier warning of delay is real but harder to put a number on; leave it out of a first estimate and treat it as upside.
Keeping the estimate honest
- Count reporting time only if someone actually stops doing it.
- Use over-billing you have actually found on past jobs, not a hoped-for percentage.
- Subtract the full cost from the cost guide, including capture and review time.
- Re-run the numbers after a pilot with what the tool actually found.
Next: put a number on it
The return from seeing progress grows when it is joined to cost: the same week tells you what is behind and what it will cost. Three places to go from here:
- The cost side. The cost overrun calculator turns percent complete and cost to date into a forecast at completion.
- How AI is tested. ConstructBench is our benchmark for AI on construction work: tasks with one right answer, graded field by field.
- See it on a job. The Constructelligence demo shows a sample portfolio forecast weekly from cost, commitments and hours.
9 columns: 7 you fill in and 2 calculated by formula and filled down 200 rows, so nothing is worked out by hand. In the Excel version, 6 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Job | Text | Job number exactly as in your accounting system (e.g. J-1104), so rows join to job cost. |
| Billed to date ($) | Amount ($) | Enter the amount in dollars. |
| Over-billing found (%) | Percent | Enter a percentage, 0–100. |
| Reporting hours / week | Number | Enter a number. |
| Weeks left | Number | Enter a number. |
| Hourly rate ($) | Number | Enter a number. |
| Value ($) | Calculated | Calculated: [Billed to date ($)] × [Over − billing found (%)] ÷ 100 + [Reporting hours ÷ week] × [Weeks left] × [Hourly rate ($)] |
| Full cost ($) | Amount ($) | Enter the amount in dollars. |
| Net ($) | Calculated | Calculated: [Value ($)] − [Full cost ($)] |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What is the ROI of construction progress tracking?
It depends on the job. The return comes from billing matched to verified progress, reporting time saved and earlier warning of delays. Estimate the first two from your own figures, subtract the full cost including capture and review time, and treat earlier warning as upside.
How does progress tracking prevent over-billing?
Subcontractor and contractor pay applications claim a percent complete per line. Verified progress from site imagery shows what is actually installed, so a line billed ahead of the work can be cut back before it is paid.
Should I trust vendor ROI figures?
Treat them as the vendor's results with its own customers. Work out the return on your own job from your own figures, and re-run it after a pilot.
Related guides
More in Progress tracking & reality capture
- Reality capture for construction: 360 cameras, drones, laser scanning and what each is for
- 360 photo documentation for construction: routes, cadence, privacy and what to capture
- Buildots vs OpenSpace: what each says it does, and which fits your job