- A 360° walk places every frame on the plan, so any spot can be seen on any date.
- Walk the same route every week, covering every active area.
- Never let work be covered before its walk exists.
- Tell crews what is recorded and blur where the tool allows.
Set a route and keep it
- Walk the same route every week so captures line up date to date.
- Cover every active area, including the ones nobody is worried about; the dispute is always somewhere else.
- Walk at a normal pace; most tools build the path from the video.
- Start and end at a fixed point the software can recognise on the plan.
Capture before cover-up
The single most valuable walk is the one before work is hidden: in-wall MEP before board, above-ceiling work before tiles, under-slab before the pour. Put cover-up dates from the three-week look-ahead on the capture plan, and do not let a ceiling close until its walk exists.
Privacy and people
360° cameras record everyone nearby. Tell the crews what is recorded and why, blur faces and screens where the tool allows, and agree who can see the captures. Some vendors describe blurring and anonymisation features; check what yours does, and check any union or local rules before the first walk.
360 documentation tools, in their own words
| Vendor | What its site says | Capture | Integrations |
|---|---|---|---|
| OpenSpace | Describes itself as “the Visual Intelligence Platform for the built world”, with progress tracking in OpenSpace Track. | “Photos, videos, voice notes, 360° walks, drone flights”, plus walk and pilot services. | Procore, Autodesk and Revizto connections are listed on its site. |
| Cupix | “Turn 360° video into as-built 4D intelligence with our digital twin platform.” | Primarily 360° video walkthroughs. | “Integrates with BIM360, ACC, Procore, Revizto, Oracle, and more.” |
| Doxel | “Automated progress tracking to build faster.” | “The 360 camera mounted to a hard hat captures everything.” | None named on the homepage. |
Last verified 6 November 2026 against each vendor’s own website: OpenSpace, Cupix, Doxel. Vendors change products often; check the source before relying on any detail here.
Using the record
- RFIs: attach the location and date instead of a description.
- Change orders: show the condition before and after; see change order management.
- Pay applications: back percent complete with dated images.
- Punch and closeout: walk the record with the owner instead of re-walking the building.
Next: put a number on it
A complete record protects you in a dispute; a forecast tells you whether there will be one. Three places to go from here:
- The cost side. The cost overrun calculator turns percent complete and cost to date into a forecast at completion.
- How AI is tested. ConstructBench is our benchmark for AI on construction work: tasks with one right answer, graded field by field.
- See it on a job. The Constructelligence demo shows a sample portfolio forecast weekly from cost, commitments and hours.
8 columns: 8 you fill in. In the Excel version, 1 column reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Date | Date | Date of the entry. |
| Walked by | Text | Free text. |
| Route | Text | Free text. |
| Areas covered | Text | Free text. |
| Before cover-up areas | Text | Free text. |
| Missed areas | Text | Free text. |
| Uploaded | Text | Free text. |
| Notes | Text | Anything that explains the row; free text. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What is 360 photo documentation in construction?
Recording a site with a 360° camera, usually on a hard hat, while walking it, with software that places each frame on the floor plan so anyone can view any location on any capture date.
How often should you do 360 site walks?
Weekly in active areas is a common rhythm, plus an extra walk before any work is covered up, because that is the record most often needed later.
Who should do the 360 walk?
Whoever will do it every week without fail: a field engineer, an assistant superintendent, or a capture service. Consistency matters more than who carries the camera.
Related guides
More in Progress tracking & reality capture
- Buildots vs OpenSpace: what each says it does, and which fits your job
- Buildots alternatives and similar startups: four progress tracking tools compared, and when to pick Buildots
- OpenSpace alternatives: four reality capture and progress tools compared, and when to pick OpenSpace
- Construction progress tracking cost: the cost model, and the questions to ask
- Progress tracking ROI: how to work out the return on your own job