- Sitework is an equipment business — production rate decides the margin.
- Compare units per hour with the estimate by activity, daily.
- Charge owned equipment to jobs, including idle time.
- Reconcile unit-price quantities with what the owner pays.
Where excavation and sitework contractor jobs make and lose money
- Production rates. Cubic yards moved per hour against the estimate.
- Equipment cost. Owned-equipment rates charged to jobs, idle time, repairs.
- Quantities. Unit-price work paid on measured quantities — overruns and underruns change revenue too.
- Weather. Lost days and rework.
Ordering stone or base? The free gravel calculator converts area and compacted depth into loose cubic yards, tons and truckloads.
Key terms: Cost code · Estimate at completion (EAC) · Productivity factor
A worked example
Mass excavation moved 14,200 cubic yards in 380 hours against an estimate of 42 yards an hour, with crew and equipment costing $610 an hour:
A production rate 11% under estimate is invisible in hours worked. In cost per yard it is $1.80 on every yard left to move.
The excavation and sitework contractor software stack
Most contractors in this trade run four or five systems. The names below are common examples, not a ranking.
A starter cost code list for excavation and sitework contractors
Divisions 31 (earthwork), 32 (exterior improvements) and 33 (utilities). On unit-price work, match the codes to the owner's pay items, so cost and revenue are measured on the same quantity.
| Code | Covers | Unit | What to watch |
|---|---|---|---|
31-100 | Clearing & grubbing | acre | Acres cleared per day |
31-200 | Mass excavation | CY | Yards per hour against estimate |
31-210 | Trench excavation & backfill | LF | Feet per day |
31-230 | Fill & compaction | CY | Lifts and failed density tests |
31-250 | Erosion & sediment control | LF | Maintenance after storms |
32-100 | Base course & paving prep | SY | Yards per hour, grade checks |
33-100 | Water lines | LF | Feet laid, tests passed |
33-300 | Sanitary sewer | LF | Feet laid, structures set |
33-400 | Storm drainage | LF | Feet laid, structures set |
Illustrative numbering — use your accounting system’s own format. What matters is that the estimate, the field and the job cost use the same list. The cost codes guide covers structure, cost types and how many codes is too many.
The numbers worth tracking weekly
Five numbers, each with its formula and the reading that should start a conversation. Most can be pulled from the job cost and timecards you already have.
| Number | How to calculate it | Warning sign | How often |
|---|---|---|---|
| Production rate | units moved ÷ crew-and-equipment hours, by activity | Below the estimate's rate for two days running | Daily |
| Cost per unit | crew + equipment cost ÷ units in place | Above the estimate's unit cost | Weekly |
| Equipment utilization | hours worked ÷ hours on the job | Machines on site and idle | Weekly |
| Quantity overrun / underrun | measured quantity − bid quantity, per pay item | Overruns not yet submitted for payment | Each pay app |
| Forecast at completion | actual unit cost × units left + cost to date | Unit cost and quantities both above bid | Weekly |
What to run as an excavation and sitework contractor business grows
The right stack depends on size more than on brand. Three stages, what each usually runs, and the sign that it is time to move up:
- 1Small sitework — a few machines
QuickBooks with job costing, a daily log of quantities and machine hours, spreadsheets for estimates
Time to move up when equipment cost never reaches the jobs that used it - 2Mid-size civil
HCSS HeavyBid and HeavyJob, construction accounting (Foundation, Viewpoint), telematics from the equipment makers
Time to move up when owned fleet, unit-price public work - 3Large heavy civil
HCSS or B2W across estimating, field and equipment, joined to the ERP (Viewpoint, Sage 300 CRE), machine control on the grade
How to choose excavation and sitework contractor software
Five questions to ask any vendor before a trial — each is about whether the software fits how this trade actually makes money.
- Does estimating work by crew, equipment and production rate?
- Can field staff record quantities and equipment hours daily?
- Does it reconcile unit-price quantities with what the owner pays for?
- Are owned-equipment costs charged to jobs, including idle time?
- Can it tell you which machines and which jobs actually make money?
Then trial it on a finished job where you already know the answer. The construction tech stack guide covers how the pieces connect.
Where Constructelligence fits
Constructelligence sits on top of the accounting system you already run — Sage 300 CRE and QuickBooks Desktop are live today, with more ERPs and project platforms in build — and forecasts every job weekly by cost code, so a production rate falling behind the estimate shows up in the week it starts. It reads read-only, runs in Constructelligence Cloud (or on your own server on the Private tier) and replaces none of the tools above. See it in the demo.
Software for other trades

Daily production by activity: quantity, crew and equipment hours, units per hour calculated against the estimate.
9 columns: 8 you fill in and 1 calculated by formula and filled down 200 rows, so nothing is worked out by hand. In the Excel version, 5 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Job | Text | Job number exactly as in your accounting system (e.g. J-1104), so rows join to job cost. |
| Date | Date | Date of the entry. |
| Activity | Text | The schedule activity or scope of work. |
| Quantity | Number | Enter a number. |
| Unit | Text | Unit of measure (EA, LF, SF, CY, HR, LS). |
| Crew hours | Number | Enter a number. |
| Equipment hours | Number | Enter a number. |
| Units per hour | Calculated | Calculated: [Quantity] ÷ [Crew hours] |
| Estimated units per hour | Number | Enter a number. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What software do excavation contractors use?
Heavy civil estimating (such as HCSS HeavyBid or B2W), field time and quantity tracking (such as HCSS HeavyJob), equipment telematics, machine control, and construction accounting such as Viewpoint, Foundation or Sage 300 CRE.
How do sitework contractors track job cost?
By activity and unit: crew and equipment hours against quantities installed, compared with the estimate's production rates, with owned equipment charged to jobs at internal rates.
Why do equipment rates matter?
Owned equipment is a real cost even when it is paid off. Charging jobs an internal hourly rate is how a contractor sees which jobs and which machines actually make money.
How do excavation contractors estimate production rates?
From equipment capacity, haul distance, material and site conditions — and, best of all, from their own completed jobs' actual units per hour for similar work.
What is the difference between owned and rented equipment cost?
Rented equipment arrives with an invoice; owned equipment needs an internal hourly rate (ownership plus operating cost) charged to jobs, or its cost never reaches the jobs that use it.
Related guides
More in Software by trade
- Construction software by trade
- General contractor software: what to run, what to track, and where jobs lose money
- Electrical contractor software: what to run, what to track, and where jobs lose money
- Plumbing software: what plumbing contractors run, what to track, and where jobs lose money
- HVAC and mechanical contractor software: what to run, what to track, and where jobs lose money
- Concrete contractor software: what to run, what to track, and where jobs lose money
- Roofing contractor software: what to run, what to track, and where jobs lose money
- Drywall and interiors contractor software: what to run, what to track, and where jobs lose money
- Home builder software: what to run, what to track, and where jobs lose money
- Remodeling contractor software: kitchen and bath project management, selections and job costing
- Deck builder software: project management, pricing and where deck jobs lose money
- Civil and utility contractor software: heavy civil estimating, pay items, quantities and job cost
- Flooring contractor software: estimating, moisture, waste and job costing per square foot
- Painting contractor software: estimating, production rates and job costing
- Kitchen and bath remodeler project management software: design, selections, change orders and job costing
- Countertop installer software: quoting, templating, slab yield and job costing
- Plastering contractor software: estimating, production rates and job costing
- Elevator contractor software: installation, modernization, service and job costing
Free tools for this topic: Construction markup vs margin calculator · Fully burdened labor rate calculator for construction · Contractor overhead recovery and break-even calculator
All software by trade resources →