Constructelligence
AI in construction · safety

Site safety AI cameras: how they work, what they detect, and what to ask before a pilot

AI safety cameras run computer vision on video from fixed cameras on site and raise an alert when they see something they are trained to spot: a missing hard hat or harness, a person inside an exclusion zone, a vehicle too close to workers. Done well, they add eyes a safety manager does not have. Done badly, they produce so many alerts that everyone stops reading them. This guide covers how they work, what to check, and how to pilot one.

Updated · 7 minute read

Key takeaways
  • AI safety cameras run computer vision on fixed camera feeds and alert on trained conditions.
  • Measure false alerts and misses in a pilot, not only catches.
  • Agree privacy, retention and crew communication before switching on.
  • An alert that leads to no action has not helped.

How AI safety cameras work

  1. Cameras: existing CCTV or the vendor's own units cover the areas that matter: gates, crane zones, edges, laydown.
  2. Detection: models look for the conditions they were trained on, frame by frame.
  3. Alerts: a detection becomes a notification, a dashboard event or a report, with the image.
  4. Trends: counts by area, time and type show where the risk is concentrated.

Fixed cameras watch the same places all the time. 360° walks (see 360 documentation) see everywhere once a week. They answer different questions.

Two vendors, in their own words

VendorWhat its site saysCapturePricing
IntenseyeA “real-time AI workplace safety platform that runs computer vision on the cameras you already have”, or its Sentinel devices, to detect “50+ types of high-risk hazards”. Its site is aimed at industrial workplaces generally, not only construction.Fixed cameras: existing IP cameras or its own Sentinel hardware.No figure: “one annual subscription per connected camera”, by quote.
viAct“Combines automated AI monitoring with real-time alerts to help safety leaders prevent risks sooner.”Existing CCTV (“video analytics enabled CCTV for construction”); its product list also includes drone, LiDAR and wearable products.No price published.

Last verified 6 November 2026 against each vendor’s own website: Intenseye, viAct. Vendors change products often; check the source before relying on any detail here.

CalculatorAlert load in a pilot

What to check before a pilot

Measuring whether it helps

Leading indicators, such as observations, near misses and corrective actions closed, should change before lagging ones like TRIR. Track both, by area, before and after; the safety metrics guide covers the formulas. A system whose alerts never lead to an action has not helped, whatever its detection rate.

Next: put a number on it

Safety and cost problems often start in the same week on the same job. Three places to go from here:

  1. The cost side. The cost overrun calculator turns percent complete and cost to date into a forecast at completion.
  2. How AI is tested. ConstructBench is our benchmark for AI on construction work: tasks with one right answer, graded field by field.
  3. See it on a job. The Constructelligence demo shows a sample portfolio forecast weekly from cost, commitments and hours.
Checklist
Free template · Safety camera pilot log (Excel & CSV)An Excel workbook with drop-downs, validation and formulas built in — or the same columns as a CSV for Google Sheets and Numbers.
Download Excel (.xlsx)
What this template captures

8 columns: 7 you fill in and 1 picked from drop-down lists, so every row uses the same values. In the Excel version, 2 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.

Every column, and how it is captured
ColumnTypeWhat goes in it
DateDateDate of the entry.
AreaTextFree text.
Alert typeTextFree text.
Real?Drop-downOptions: Yes / No.
Action takenTextFree text.
Closed byTextFree text.
Minutes to reviewNumberEnter a number.
NotesTextAnything that explains the row; free text.

See it on real-looking numbers

Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.

Try the demoJoin the private beta

Frequently asked questions

How do AI safety cameras work on construction sites?

Computer vision runs on video from fixed cameras, either existing CCTV or the vendor's own units, and raises alerts when it detects conditions it was trained on, such as missing PPE or a person inside an exclusion zone, with the image attached.

How much do AI safety cameras cost?

Vendors rarely publish figures. Intenseye's pricing page, for example, says it charges one annual subscription per connected camera, by quote. Add camera hardware, installation, connectivity and the time to review and act on alerts.

Are AI safety cameras legal on job sites?

Rules on workplace video and biometric data vary by state and country. Check local law and any union agreement, tell crews what is recorded and why, and use blurring and access controls where the system offers them.

CI
Written by the Constructelligence teamConstruction finance and software. Worked examples use the sample demo portfolio; formulas are standard practice. Reviewed September 2026.

More in AI in construction

Free tools for this topic: Construction PDF to Excel converter · Schedule PDF to Excel (P6 & MS Project) · Construction schedule health check

All ai in construction resources →