- Kitchen and bath jobs are sold on design and lost on selections, allowances and lead times.
- Bill every selection over its allowance as a signed change order, with your markup, before anything is ordered.
- Order cabinets, tops and custom glass off signed selections; the schedule starts from their delivery dates.
- Close every job with estimated against actual cost by category so the next design is priced from your own numbers.
Project management software for kitchen and bath remodelers
Kitchen and bathroom project management software has to do four things: track every selection against its allowance, price change orders before work proceeds, hold the lead times that set the schedule, and cost the job by cost code so the margin is known while there is time to act.
| Need | What to look for |
|---|---|
| Selections and allowances | Each selection priced, signed off and compared with its allowance |
| Change orders | Priced with markup and approved before the work is done |
| Lead times and sequence | Cabinet and countertop dates drive the schedule, with trades in order |
| Job costing | Cost by code, with cost to complete updated weekly |
| Client view | A single place for approvals, selections and photos |
Where kitchen and bath remodeler jobs make and lose money
- Selections over allowance. A cabinet, tile or fixture choice above its allowance is a change order with markup, or it is the margin.
- Lead times. Cabinets, countertops and custom glass set the schedule. Demolition before the delivery date is confirmed means a kitchen out of service for weeks.
- Hidden conditions. Rot under the tub, undersized drains, old wiring. Priced as a contingency or a signed change order, or absorbed.
- Trade sequencing. Countertops are templated after cabinets are set; plumbing and electrical trim wait for tops. Each gap is days of carrying cost.
Key terms: Allowance · Change order (CO) · Estimate at completion (EAC) · Fade
A worked example
A $64,000 kitchen estimated to cost $46,000, a 28.1% gross margin. The contract carries an $8,000 cabinet allowance; the client chooses cabinets at $11,400. The company bills allowance overages at cost plus 20%:
One unbilled selection takes more than five points of margin. The same arithmetic applies to tile, fixtures and appliances, which is why every allowance needs its own line on the budget.
The kitchen and bath remodeler software stack
Most contractors in this trade run four or five systems. The names below are common examples, not a ranking.
A starter cost code list for kitchen and bath remodelers
A short list by category, so estimate, selections and job cost line up and allowances can be watched one by one.
| Code | Covers | Unit | What to watch |
|---|---|---|---|
100 | Design & permits | job | Design hours against the fee |
200 | Demolition & disposal | job | Hidden conditions found |
300 | Cabinets (allowance) | $ | Selection against allowance |
400 | Countertops (allowance) | SF | Template and install dates |
500 | Tile & finishes (allowance) | SF | Waste and selection changes |
600 | Plumbing & electrical subcontracts | contract | Committed against estimate |
900 | Change orders, one code each | CO | Approved against pending |
Illustrative numbering — use your accounting system’s own format. What matters is that the estimate, the field and the job cost use the same list. The cost codes guide covers structure, cost types and how many codes is too many.
The numbers worth tracking weekly
Five numbers, each with its formula and the reading that should start a conversation. Most can be pulled from the job cost and timecards you already have.
| Number | How to calculate it | Warning sign | How often |
|---|---|---|---|
| Selections approved | selections signed ÷ selections needed, per job | Any job past demolition with open selections | Weekly |
| Allowance overage billed | overage change orders billed ÷ overages incurred | Below 100% on any job | Each selection |
| Long-lead items on order | items ordered ÷ items with need dates in the next eight weeks | An item past its order-by date | Weekly |
| Gross margin per job | (price − cost) ÷ price, by category | A category over its estimate on two jobs running | Each job |
| Demolition to completion | working days, per job type | Rising for the same job type | Monthly |
What to run as a kitchen and bath remodeler business grows
The right stack depends on size more than on brand. Three stages, what each usually runs, and the sign that it is time to move up:
- 1Owner-led design-build
A design tool, a residential platform for selections and change orders, and QuickBooks
Time to move up when selections and orders are tracked in email and spreadsheets - 2Several designers and crews
Design tool feeding the estimate, the platform for every job with a client portal, photos with CompanyCam
Time to move up when many jobs at once and margins that vary unexplained - 3Established K&B firm
Estimated against actual by category reviewed monthly, allowances and lead times tracked per job, a forecast across jobs
How to choose kitchen and bath remodeler software
Five questions to ask any vendor before a trial — each is about whether the software fits how this trade actually makes money.
- Can the design tool's cabinet and fixture lists flow into the estimate and the selections, without re-entry?
- Can the client approve selections and allowance overages in a portal before anything is ordered?
- Are long-lead items (cabinets, tops, glass) tracked from order to delivery against the schedule?
- Does a signed change order update the contract, the budget and the next invoice in one step?
- Does it show estimated against actual cost by category on every finished job?
Then trial it on a finished job where you already know the answer. The construction tech stack guide covers how the pieces connect.
Where Constructelligence fits
Constructelligence sits on top of the accounting system you already run — Sage 300 CRE and QuickBooks Desktop are live today, with more ERPs and project platforms in build — and forecasts every job weekly by cost code, so a job running over its estimate by category shows up in the week it starts. It reads read-only, runs in Constructelligence Cloud (or on your own server on the Private tier) and replaces none of the tools above. See it in the demo.
Software for other trades
11 columns: 9 you fill in and 2 calculated by formula and filled down 200 rows, so nothing is worked out by hand. In the Excel version, 6 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Job | Text | Job number exactly as in your accounting system (e.g. J-1104), so rows join to job cost. |
| Item | Text | Line number, so the row can be referred to. |
| Allowance | Amount ($) | Enter the amount in dollars. |
| Selection | Text | Free text. |
| Selection cost | Amount ($) | Enter the amount in dollars. |
| Overage | Calculated | Calculated: [Selection cost] − [Allowance] |
| Markup % | Percent | Enter a percentage, 0–100. |
| Change order amount | Calculated | Calculated: [Overage] × (1 + [Markup %] ÷ 100) |
| Approved | Amount ($) | Enter the amount in dollars. |
| Order date | Date | Enter the date. |
| Delivery date | Date | Enter the date. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What is the best software for kitchen and bath remodelers?
Most combine a kitchen and bath design tool (2020 Design Live and Chief Architect are common examples) with a residential construction platform that handles selections, allowances, change orders, schedules and client communication (Buildertrend, JobTread or Houzz Pro, for example), photo documentation, and QuickBooks or a similar accounting system.
How do kitchen and bath remodelers manage projects?
From signed design and selections, to orders placed against confirmed delivery dates, to a schedule built backwards from those dates, with every change priced and signed before the work and estimated against actual cost reviewed when the job closes.
Is kitchen and bath remodeling software different from general remodeling software?
Mostly in the design and selections end: cabinet and fixture design tools, detailed selection sheets with allowances, and long-lead order tracking matter more in a kitchen or bath than in a general remodel. The project management and job costing needs are the same.
What is an allowance in a kitchen or bath contract?
A budget amount in the contract for an item the client has not chosen yet, such as cabinets, tile or fixtures. If the selection costs more than the allowance, the difference (usually with the contractor's markup) is billed as a change order; if it costs less, the client is credited.
When should kitchen cabinets be ordered?
As soon as the selection and the final measurements are signed, because cabinets are usually the longest-lead item and the countertop template, plumbing and electrical trim all wait for them. Many remodelers do not start demolition until the cabinet delivery date is confirmed.
Related guides
More in Software by trade
- Construction software by trade
- General contractor software: what to run, what to track, and where jobs lose money
- Electrical contractor software: what to run, what to track, and where jobs lose money
- Plumbing software: what plumbing contractors run, what to track, and where jobs lose money
- HVAC and mechanical contractor software: what to run, what to track, and where jobs lose money
- Concrete contractor software: what to run, what to track, and where jobs lose money
- Roofing contractor software: what to run, what to track, and where jobs lose money
- Excavation and sitework contractor software: what to run, what to track, and where jobs lose money
- Drywall and interiors contractor software: what to run, what to track, and where jobs lose money
- Home builder software: what to run, what to track, and where jobs lose money
- Deck builder software: project management, pricing and where deck jobs lose money
- Civil and utility contractor software: heavy civil estimating, pay items, quantities and job cost
- Flooring contractor software: estimating, moisture, waste and job costing per square foot
- Painting contractor software: estimating, production rates and job costing
- Plastering contractor software: estimating, production rates and job costing
- Elevator contractor software: installation, modernization, service and job costing
Free tools for this topic: Construction markup vs margin calculator · Fully burdened labor rate calculator for construction · Contractor overhead recovery and break-even calculator
All software by trade resources →