- Elevator work is three businesses: new installation, modernization and service, each priced and costed differently.
- On installs, equipment is committed early and install labor in team-days decides the margin.
- Track committed equipment cost from the day the order is placed, not when the invoice arrives.
- Keep service contract revenue and cost apart from project work so neither hides the other.
Where elevator contractor jobs make and lose money
- Install labor. Team-days per car against the estimate. Equipment is fixed at order; labor is where the margin moves.
- Site readiness. A hoistway, machine room or permanent power not ready on the scheduled date is a delay, with a notice clock, not a productivity loss.
- Committed equipment. Equipment ordered months before it is invoiced is cost that has to show on the job from the order date.
- Inspections. A failed or late inspection holds turnover and the final payment.
- Service mixed with projects. Maintenance revenue blended with installs hides which line of business makes money.
Key terms: Committed cost · Change order (CO) · Estimate at completion (EAC) · Retainage
A worked example
A two-car new installation bid at $640,000. Equipment is $145,000 per car; the estimate allows 60 team-days per car at $1,900 a team-day for a mechanic and helper. The cars are taking 72 team-days each:
The equipment cost was fixed at order; the twelve extra team-days per car took seven points. Whether they are a claim depends on why: a hoistway not ready on the date the schedule promised is a delay with a notice clock, not a productivity problem.
The elevator contractor software stack
Most contractors in this trade run four or five systems. The names below are common examples, not a ranking.
A starter cost code list for elevator contractors
Cost each car by phase, so team-days and lost days can be compared job to job.
| Code | Covers | Unit | What to watch |
|---|---|---|---|
14-2100 | Equipment package | car | Committed against estimate |
14-2110 | Rails & guides | team-days | Days per car |
14-2120 | Machine & controller | team-days | Days per car |
14-2130 | Car, doors & entrances | team-days | Days per car |
14-2140 | Wiring, adjusting & testing | team-days | Days per car |
14-2190 | Inspection & turnover | job | Failed items |
Illustrative numbering — use your accounting system’s own format. What matters is that the estimate, the field and the job cost use the same list. The cost codes guide covers structure, cost types and how many codes is too many.
The numbers worth tracking weekly
Five numbers, each with its formula and the reading that should start a conversation. Most can be pulled from the job cost and timecards you already have.
| Number | How to calculate it | Warning sign | How often |
|---|---|---|---|
| Team-days per car | install team-days to date ÷ phase complete, per car | Above the estimate in any phase | Weekly |
| Committed equipment | equipment ordered ÷ equipment estimated | Over the estimate before install starts | Each order |
| Lost days, site not ready | crew-days lost to hoistway, power or access | Any day without a written notice | Weekly |
| Inspections passed first time | passed ÷ inspections held | A repeat failure item | Monthly |
| Service contract margin | (contract revenue − labor − parts) ÷ revenue, per building | Callbacks rising on a contract | Monthly |
What to run as an elevator contractor business grows
The right stack depends on size more than on brand. Three stages, what each usually runs, and the sign that it is time to move up:
- 1Independent service company
Field service software for maintenance contracts and callbacks, accounting with jobs
Time to move up when installs and modernizations start to overlap - 2Install and modernization contractor
A construction ERP with job cost by car and phase, committed equipment, certified payroll where required
Time to move up when several projects and a service base to report separately - 3Established elevator contractor
Install, modernization and service reported as separate lines, team-days by phase reviewed monthly
How to choose elevator contractor software
Five questions to ask any vendor before a trial — each is about whether the software fits how this trade actually makes money.
- Can new installation, modernization and service be costed and reported as separate lines of business?
- Is equipment committed cost visible the day the order is placed?
- Can install labor be tracked in team-days by car and phase against the estimate?
- Are inspection dates and hoistway-ready dates tied to the schedule, with delays logged?
- Does service management handle maintenance contracts, callbacks and billing without re-keying into accounting?
Then trial it on a finished job where you already know the answer. The construction tech stack guide covers how the pieces connect.
Where Constructelligence fits
Constructelligence sits on top of the accounting system you already run — Sage 300 CRE and QuickBooks Desktop are live today, with more ERPs and project platforms in build — and forecasts every job weekly by cost code, so an installation running over its estimated team-days shows up in the week it starts. It reads read-only, runs in Constructelligence Cloud (or on your own server on the Private tier) and replaces none of the tools above. See it in the demo.
Software for other trades
10 columns: 9 you fill in and 1 calculated by formula and filled down 200 rows, so nothing is worked out by hand. In the Excel version, 4 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Job | Text | Job number exactly as in your accounting system (e.g. J-1104), so rows join to job cost. |
| Car | Text | Free text. |
| Phase | Text | Phase of the work (e.g. underground, rough-in, trim). |
| Estimated team-days | Number | Enter a number. |
| Actual team-days | Number | Enter a number. |
| Variance | Calculated | Calculated: [Actual team − days] − [Estimated team − days] |
| Lost days (site not ready) | Number | Enter a number. |
| Notice sent | Text | Free text. |
| Inspection date | Date | Enter the date. |
| Result | Text | Free text. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What software do elevator contractors use?
Usually a construction ERP for job cost, payroll and billing (Sage 300 CRE, Viewpoint Vista or Foundation are examples), estimating in spreadsheets or a takeoff tool, the general contractor's project platform on new construction, and field service management software for maintenance contracts, callbacks and repairs.
How do elevator contractors estimate an installation?
Per car: the equipment package from the manufacturer's quote, install labor in team-days by phase from past jobs, materials, crane or hoisting, permits and inspections, and the site conditions the schedule assumes, such as when the hoistway and permanent power will be ready.
How is elevator modernization different from new installation?
Modernization works in an occupied building with existing equipment, so it is phased car by car, carries more unknowns in the existing hoistway and machine room, and needs the building's traffic kept moving. Labor and risk are priced per phase rather than per new car.
How do elevator contractors track installation labor?
In team-days or hours per car, by phase (rails, machine and controller, car and doors, wiring, adjusting, inspection), against the estimate, with the reason for every lost day recorded. Days lost to a hoistway or power not being ready are a delay to notice, not a productivity loss.
Should elevator service be accounted for separately from installation?
Yes. Service and maintenance contracts are recurring revenue with their own labor and parts cost; mixing them with new installation and modernization jobs hides whether each line of business makes money.
Related guides
More in Software by trade
- Construction software by trade
- Electrical contractor software: what to run, what to track, and where jobs lose money
- Plumbing software: what plumbing contractors run, what to track, and where jobs lose money
- HVAC and mechanical contractor software: what to run, what to track, and where jobs lose money
- Concrete contractor software: what to run, what to track, and where jobs lose money
- Roofing contractor software: what to run, what to track, and where jobs lose money
- Excavation and sitework contractor software: what to run, what to track, and where jobs lose money
- Drywall and interiors contractor software: what to run, what to track, and where jobs lose money
- Home builder software: what to run, what to track, and where jobs lose money
- Remodeling contractor software: kitchen and bath project management, selections and job costing
- Deck builder software: project management, pricing and where deck jobs lose money
- Civil and utility contractor software: heavy civil estimating, pay items, quantities and job cost
- Flooring contractor software: estimating, moisture, waste and job costing per square foot
- Painting contractor software: estimating, production rates and job costing
- Kitchen and bath remodeler project management software: design, selections, change orders and job costing
- Countertop installer software: quoting, templating, slab yield and job costing
- Plastering contractor software: estimating, production rates and job costing
Free tools for this topic: Construction markup vs margin calculator · Fully burdened labor rate calculator for construction · Contractor overhead recovery and break-even calculator
All software by trade resources →