Constructelligence
Software by trade · elevator contractor

Elevator contractor software: installation, modernization, service and job costing

An elevator contractor runs three businesses under one roof. New installation is a project with equipment ordered months ahead and install labor in mechanic-and-helper team-days. Modernization replaces controllers, machines and fixtures in a building that stays occupied. Service is recurring maintenance contracts, callbacks and repairs. Each is priced and costed differently, and the software question is whether committed equipment, install labor and service work are each visible on their own while they are happening.

Updated · 9 minute read

Key takeaways
  • Elevator work is three businesses: new installation, modernization and service, each priced and costed differently.
  • On installs, equipment is committed early and install labor in team-days decides the margin.
  • Track committed equipment cost from the day the order is placed, not when the invoice arrives.
  • Keep service contract revenue and cost apart from project work so neither hides the other.

Where elevator contractor jobs make and lose money

Key terms: Committed cost · Change order (CO) · Estimate at completion (EAC) · Retainage

A worked example

A two-car new installation bid at $640,000. Equipment is $145,000 per car; the estimate allows 60 team-days per car at $1,900 a team-day for a mechanic and helper. The cars are taking 72 team-days each:

Estimated cost = 2 × $145,000 + 2 × 60 × $1,900$518,000
Margin as bid19.1%
Cost at 72 team-days = $290,000 + 2 × 72 × $1,900$563,600
Margin at actual11.9%

The equipment cost was fixed at order; the twelve extra team-days per car took seven points. Whether they are a claim depends on why: a hoistway not ready on the date the schedule promised is a delay with a notice clock, not a productivity problem.

CalculatorInstall team-days and margin

The elevator contractor software stack

Most contractors in this trade run four or five systems. The names below are common examples, not a ranking.

Estimating
spreadsheetsBluebeam
Commercial project management
Procore
usually the GC's
Service & maintenance
field service management software
Accounting / ERP
Sage 300 CREViewpoint VistaFoundation

A starter cost code list for elevator contractors

Cost each car by phase, so team-days and lost days can be compared job to job.

CodeCoversUnitWhat to watch
14-2100Equipment packagecarCommitted against estimate
14-2110Rails & guidesteam-daysDays per car
14-2120Machine & controllerteam-daysDays per car
14-2130Car, doors & entrancesteam-daysDays per car
14-2140Wiring, adjusting & testingteam-daysDays per car
14-2190Inspection & turnoverjobFailed items

Illustrative numbering — use your accounting system’s own format. What matters is that the estimate, the field and the job cost use the same list. The cost codes guide covers structure, cost types and how many codes is too many.

Estimateequipment · team-daysOrdercommitted equipmentInstalldays by carTurnoverinspectionOne cost code at every step — e.g. 14-2110 Rails & guides
If the estimate, the field and the job cost use different lists, nothing downstream can be compared with what was assumed. One list, every step.

The numbers worth tracking weekly

Five numbers, each with its formula and the reading that should start a conversation. Most can be pulled from the job cost and timecards you already have.

NumberHow to calculate itWarning signHow often
Team-days per carinstall team-days to date ÷ phase complete, per carAbove the estimate in any phaseWeekly
Committed equipmentequipment ordered ÷ equipment estimatedOver the estimate before install startsEach order
Lost days, site not readycrew-days lost to hoistway, power or accessAny day without a written noticeWeekly
Inspections passed first timepassed ÷ inspections heldA repeat failure itemMonthly
Service contract margin(contract revenue − labor − parts) ÷ revenue, per buildingCallbacks rising on a contractMonthly

What to run as an elevator contractor business grows

The right stack depends on size more than on brand. Three stages, what each usually runs, and the sign that it is time to move up:

  1. 1
    Independent service company

    Field service software for maintenance contracts and callbacks, accounting with jobs

    Time to move up when installs and modernizations start to overlap
  2. 2
    Install and modernization contractor

    A construction ERP with job cost by car and phase, committed equipment, certified payroll where required

    Time to move up when several projects and a service base to report separately
  3. 3
    Established elevator contractor

    Install, modernization and service reported as separate lines, team-days by phase reviewed monthly

How to choose elevator contractor software

Five questions to ask any vendor before a trial — each is about whether the software fits how this trade actually makes money.

  1. Can new installation, modernization and service be costed and reported as separate lines of business?
  2. Is equipment committed cost visible the day the order is placed?
  3. Can install labor be tracked in team-days by car and phase against the estimate?
  4. Are inspection dates and hoistway-ready dates tied to the schedule, with delays logged?
  5. Does service management handle maintenance contracts, callbacks and billing without re-keying into accounting?

Then trial it on a finished job where you already know the answer. The construction tech stack guide covers how the pieces connect.

Where Constructelligence fits

Constructelligence sits on top of the accounting system you already run — Sage 300 CRE and QuickBooks Desktop are live today, with more ERPs and project platforms in build — and forecasts every job weekly by cost code, so an installation running over its estimated team-days shows up in the week it starts. It reads read-only, runs in Constructelligence Cloud (or on your own server on the Private tier) and replaces none of the tools above. See it in the demo.

Software for other trades

Checklist
Free template · Elevator install tracker (Excel & CSV)An Excel workbook with drop-downs, validation and formulas built in — or the same columns as a CSV for Google Sheets and Numbers.
Download Excel (.xlsx)
What this template captures

10 columns: 9 you fill in and 1 calculated by formula and filled down 200 rows, so nothing is worked out by hand. In the Excel version, 4 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.

Every column, and how it is captured
ColumnTypeWhat goes in it
JobTextJob number exactly as in your accounting system (e.g. J-1104), so rows join to job cost.
CarTextFree text.
PhaseTextPhase of the work (e.g. underground, rough-in, trim).
Estimated team-daysNumberEnter a number.
Actual team-daysNumberEnter a number.
VarianceCalculatedCalculated: [Actual team − days] − [Estimated team − days]
Lost days (site not ready)NumberEnter a number.
Notice sentTextFree text.
Inspection dateDateEnter the date.
ResultTextFree text.

See it on real-looking numbers

Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.

Try the demoJoin the private beta

Frequently asked questions

What software do elevator contractors use?

Usually a construction ERP for job cost, payroll and billing (Sage 300 CRE, Viewpoint Vista or Foundation are examples), estimating in spreadsheets or a takeoff tool, the general contractor's project platform on new construction, and field service management software for maintenance contracts, callbacks and repairs.

How do elevator contractors estimate an installation?

Per car: the equipment package from the manufacturer's quote, install labor in team-days by phase from past jobs, materials, crane or hoisting, permits and inspections, and the site conditions the schedule assumes, such as when the hoistway and permanent power will be ready.

How is elevator modernization different from new installation?

Modernization works in an occupied building with existing equipment, so it is phased car by car, carries more unknowns in the existing hoistway and machine room, and needs the building's traffic kept moving. Labor and risk are priced per phase rather than per new car.

How do elevator contractors track installation labor?

In team-days or hours per car, by phase (rails, machine and controller, car and doors, wiring, adjusting, inspection), against the estimate, with the reason for every lost day recorded. Days lost to a hoistway or power not being ready are a delay to notice, not a productivity loss.

Should elevator service be accounted for separately from installation?

Yes. Service and maintenance contracts are recurring revenue with their own labor and parts cost; mixing them with new installation and modernization jobs hides whether each line of business makes money.

CI
Written by the Constructelligence teamConstruction finance and software. Worked examples use the sample demo portfolio; formulas are standard practice. Reviewed September 2026.