- One row per item, with an owner and a due date.
- Keep the item number from meeting to meeting so open items can be followed.
- Start each meeting from the open items, oldest first.
What each minutes item needs
Every row records a topic and ends in either a decision or an action. The columns that matter:
- Item number that stays with the item from meeting to meeting, so an open item can be followed.
- Topic and discussion in a sentence or two, not a transcript.
- Decision or action, written so a person who was absent can act on it.
- Owner: one named person or company, never "the team".
- Due date, and a status that is updated at the next meeting.
A filled-in example
| No. | Topic | Decision or action | Owner | Due | Status |
|---|---|---|---|---|---|
| 14 | Level 3 ductwork clash at gridline C | Mechanical to reroute below the beam and send a revised sketch | Mechanical sub | Nov 22 | Open |
| 15 | Curtain wall submittal late | GC to ask the architect for a conditional release so fabrication can start | Project manager | Nov 20 | Open |
| 11 | Fire-rated door hardware | Hardware schedule approved; order released | Procurement | Nov 15 | Closed |
Habits that make minutes useful
Send the minutes within a day, while everyone remembers, and ask for corrections by a stated date, after which they stand. Start the next meeting by reading the open items, oldest first. An item that has been open for three meetings in a row is not an action any more; it is a problem to escalate. Keep the list to one page for the people who need it, and link to detail instead of pasting it.
Decisions that change cost or time should be turned into a change order or an RFI, with the minutes item number as the reference, so the record does not live in one place only.
How to fill it in
Add one row per item. Keep the item number when it carries to the next meeting and change the status, so the history stays in one row. Filter by owner before the meeting to see what each person committed to, and by status to see what is open. Rows past their due date are your agenda.
10 columns: 10 you fill in. In the Excel version, 4 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Item no. | Number | Enter a number. |
| Meeting date | Date | Enter the date. |
| Topic | Text | Free text. |
| Discussion | Text | Free text. |
| Decision or action | Text | Free text. |
| Owner | Text | The person responsible for the row. |
| Due date | Date | Enter the date. |
| Status | Text | Where the item stands; pick from the list so the log can be filtered and counted. |
| Date closed | Date | Enter the date. |
| Carried from meeting | Text | Free text. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What should construction meeting minutes include?
The date, attendees, and for each item the topic, the decision or action, the owner and the due date. Keep it to what someone absent needs to act on.
How soon should minutes be sent out?
Within a day or two, while the meeting is fresh, with a stated date after which they are taken as correct.
Who should take the minutes?
Whoever runs the job meeting, usually the project manager or a coordinator. The person chairing and the person recording are better as two people.
Related guides
More in Templates & forms
- Free construction templates for Excel, Google Sheets and PDF
- Construction scope of work template: what to include, a filled-in example and a free download
- Construction schedule template: activities, workday finish dates and a free Excel download
- Punch list template: the fields that get items closed, an example and a free Excel download
- Construction estimate template: labor, material, equipment and subs by cost code — free Excel
- Construction change order form: what it must show, a priced example and a free template
- Construction daily report template: what to record every day, an example and a free download
- Construction budget template: budget, committed, actual and forecast by cost code — free Excel
- Construction bid template: base bid, alternates, unit prices and exclusions — free Excel
- Construction proposal template: scope, price, exclusions and payment schedule — free download
- Construction timesheet template: hours by job and cost code, overtime and labor cost — free Excel
- Submittal log template: track every submittal from spec to approval — free Excel
- Toolbox talk template: a sign-in record of the topic, the hazards and who attended, with a free Excel download
- Equipment log template: hours, fuel and service due for each machine, with a free Excel download
- Lien waiver log template: track conditional and unconditional waivers against every payment, with a free Excel download