- Pick topics from the work the crew is about to do.
- Record the topic, the hazards, who attended and what needs follow-up.
- Close out what the crew raises, or they stop raising it.
What the record needs
- Date, project and topic, so the talk can be matched to the work that week.
- Presented by, usually the foreman or the safety lead.
- Key points and hazards discussed in a line or two.
- Attendee name and company, and whether they signed.
- Follow-up needed, and who owns it, for anything raised that needs action.
Whether a record is required, and how often talks must be given, depends on the contract, the owner's safety program and local rules. Check yours.
A filled-in example
| Date | Topic | Hazards discussed | Attendee | Company | Signed | Follow-up |
|---|---|---|---|---|---|---|
| Nov 17 | Working near open edges | Unprotected edge at level 4, guardrail removal for deliveries | J. Alvarez | Core Concrete | Yes | Replace missing guardrail section, foreman, today |
| Nov 17 | Working near open edges | Same | T. Nguyen | Brightline Painting | Yes |
Making the talk worth the time
Choose the topic from what the crew will actually do this week: the pour, the lift, the new trade starting on the floor. Keep it short, ask a question rather than read a sheet, and ask the crew what they see that could go wrong. Write down anything they raise and close it out, because a crew that sees its concerns fixed will keep raising them.
Use the same record each time so that a month of talks can be filtered by topic or by company. Safety numbers such as TRIR and DART are lagging; the talks are one of the leading indicators.
How to fill it in
One row per attendee. Copy the date, topic and hazards down for everyone at the talk, add each attendee and company, and mark who signed. Use the follow-up column for anything that needs action and filter on it before the next talk.
12 columns: 10 you fill in and 2 picked from drop-down lists, so every row uses the same values. In the Excel version, 1 column reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Date | Date | Date of the entry. |
| Project | Text | Free text. |
| Topic | Text | Free text. |
| Presented by | Text | Free text. |
| Key points | Text | Free text. |
| Hazards discussed | Text | Free text. |
| Attendee | Text | Free text. |
| Company | Text | Free text. |
| Signed (Y/N) | Drop-down | Options: Y / N. |
| Follow-up needed | Text | Free text. |
| Follow-up owner | Text | Free text. |
| Closed (Y/N) | Drop-down | Options: Y / N. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What is a toolbox talk?
A short safety talk, typically five to fifteen minutes, given to a crew before work starts, covering a hazard or task relevant to that day or week.
How often should toolbox talks be held?
Often weekly, but owners, insurers and contracts differ. Follow the requirement in your contract and safety program.
Do toolbox talks need to be recorded?
A record shows the talk happened and who attended, and many owners and insurers ask for it. Keep the topic, date, attendees and any follow-up.
Related guides
More in Templates & forms
- Free construction templates for Excel, Google Sheets and PDF
- Construction scope of work template: what to include, a filled-in example and a free download
- Construction schedule template: activities, workday finish dates and a free Excel download
- Construction estimate template: labor, material, equipment and subs by cost code — free Excel
- Construction change order form: what it must show, a priced example and a free template
- Construction budget template: budget, committed, actual and forecast by cost code — free Excel
- Construction bid template: base bid, alternates, unit prices and exclusions — free Excel
- RFI template: how to write a construction RFI, an example and a free form and log
- Construction proposal template: scope, price, exclusions and payment schedule — free download
- Construction timesheet template: hours by job and cost code, overtime and labor cost — free Excel
- Submittal log template: track every submittal from spec to approval — free Excel
- Construction meeting minutes template: decisions, actions and owners, with a free Excel download
- Equipment log template: hours, fuel and service due for each machine, with a free Excel download
- Lien waiver log template: track conditional and unconditional waivers against every payment, with a free Excel download