- One row per payment, with the waiver type and amount.
- Check that the waiver amount matches the payment.
- The form is state-specific: use your state's form or your attorney's.
What the log tracks
- Subcontractor or supplier and the pay application number.
- Payment amount and the through date the payment covers.
- Waiver type: conditional or unconditional, progress or final. See the lien waiver guide for what each does.
- Waiver amount and date received, with a check that the amount matches the payment.
- Status: received, outstanding or exception.
A filled-in example
| Subcontractor | Pay app | Payment | Waiver type | Waiver amount | Received | Matches |
|---|---|---|---|---|---|---|
| Core Concrete | 4 | $118,500 | Conditional progress | $118,500 | Nov 10 | Yes |
| Brightline Painting | 2 | $22,000 | Conditional progress | $20,000 | Nov 11 | No: $2,000 short |
| Apex Electric | 5 | $64,200 | Unconditional progress | Outstanding |
Rules that keep the log useful
Collect a conditional waiver before the payment and the unconditional one after it clears, as your contract and state law require. Do not release payment against a waiver for a different amount: investigate the gap first. Keep the log with the retainage records, since final waivers and the release of retainage usually go together.
The state's rules decide the form, the wording and sometimes the timing. This log tells you what has been received; it is not legal advice on what is required.
How to fill it in
Add a row for each payment as the pay application is approved. Fill in the waiver details when the document arrives; the Matches column compares it with the payment. Filter on Outstanding before each payment run.
10 columns: 9 you fill in and 1 calculated by formula and filled down 200 rows, so nothing is worked out by hand. In the Excel version, 6 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Subcontractor | Amount ($) | Enter the amount in dollars. |
| Pay app no. | Number | Enter a number. |
| Payment amount | Amount ($) | Enter the amount in dollars. |
| Through date | Date | Enter the date. |
| Waiver type | Text | Free text. |
| Waiver amount | Amount ($) | Enter the amount in dollars. |
| Date received | Date | Enter the date. |
| Matches payment | Calculated | Calculated: IF([Waiver amount]=[Payment amount], "Yes", "No") |
| Status | Text | Where the item stands; pick from the list so the log can be filtered and counted. |
| Notes | Text | Anything that explains the row; free text. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What is a lien waiver log?
A record, one row per payment, of which lien waiver was requested and received, for what amount and when, so payments are not made without the right waiver.
What is the difference between conditional and unconditional lien waivers?
A conditional waiver takes effect only when the stated payment is received. An unconditional waiver takes effect when signed, whether or not payment arrives.
Should a payment be released if the waiver amount does not match?
Investigate first. A waiver for a different amount may leave the payment unprotected or release more than was paid. Follow your contract and your attorney's advice.
Related guides
More in Templates & forms
- Free construction templates for Excel, Google Sheets and PDF
- Construction scope of work template: what to include, a filled-in example and a free download
- Construction schedule template: activities, workday finish dates and a free Excel download
- Punch list template: the fields that get items closed, an example and a free Excel download
- Construction estimate template: labor, material, equipment and subs by cost code — free Excel
- Construction change order form: what it must show, a priced example and a free template
- Construction daily report template: what to record every day, an example and a free download
- Construction budget template: budget, committed, actual and forecast by cost code — free Excel
- Construction bid template: base bid, alternates, unit prices and exclusions — free Excel
- RFI template: how to write a construction RFI, an example and a free form and log
- Construction proposal template: scope, price, exclusions and payment schedule — free download
- Construction timesheet template: hours by job and cost code, overtime and labor cost — free Excel
- Submittal log template: track every submittal from spec to approval — free Excel
- Construction meeting minutes template: decisions, actions and owners, with a free Excel download
- Toolbox talk template: a sign-in record of the topic, the hazards and who attended, with a free Excel download
- Equipment log template: hours, fuel and service due for each machine, with a free Excel download