- Record meter hours at the start and end of each shift.
- Charge every hour to a job and cost code.
- A machine that works few hours has a high hourly rate, which is the case for renting.
What the log records
- Equipment ID and description, so the same machine is always the same row group.
- Date, start and end hours from the meter, with hours used worked out for you.
- Project and cost code, so the hours are charged to a job.
- Operator and fuel, for payroll, productivity and fuel cost.
- Service due at a meter reading, with a flag when the machine passes it.
A filled-in example
| Equipment | Date | Start | End | Hours | Project / code | Fuel (gal) | Service due at | Flag |
|---|---|---|---|---|---|---|---|---|
| EX-210 excavator | Nov 16 | 1,842.0 | 1,849.5 | 7.5 | Harbour St · 02-200 | 58 | 1,900 | |
| EX-210 excavator | Nov 17 | 1,849.5 | 1,857.0 | 7.5 | Harbour St · 02-200 | 61 | 1,900 | Service in 43 h |
From hours to a cost per hour
An hourly rate lets you charge a machine to a job and check whether owning it pays. Take the monthly ownership cost (payment or depreciation, insurance), add the monthly maintenance, divide by the hours it works in a month, then add fuel and the operator for the operating rate. The calculator below does the sum. A machine that works few hours a month has a high rate per hour, which is the case for renting instead.
Hours logged to a cost code also feed the productivity comparison: yards moved per machine hour against the estimate.
How to fill it in
Record the meter hours at the start and end of each shift, not an estimate. Keep one row per machine per day. Filter by equipment to see its hours and fuel, by project to see what it cost a job, and by the flag to see which machines are due for service.
13 columns: 11 you fill in and 2 calculated by formula and filled down 200 rows, so nothing is worked out by hand. In the Excel version, 6 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.
Every column, and how it is captured
| Column | Type | What goes in it |
|---|---|---|
| Equipment ID | Amount ($) | Enter the amount in dollars. |
| Description | Text | What the line is, in words the other party will recognise. |
| Date | Date | Date of the entry. |
| Start hours | Number | Enter a number. |
| End hours | Number | Enter a number. |
| Hours used | Calculated | Calculated: [End hours] − [Start hours] |
| Project | Text | Free text. |
| Cost code | Text | Cost code from your cost code list, matching the estimate and the ERP. |
| Operator | Text | Free text. |
| Fuel (gal) | Number | Enter a number. |
| Service due at (hours) | Number | Enter a number. |
| Hours to service | Calculated | Calculated: [Service due at (hours)] − [End hours] |
| Notes | Text | Anything that explains the row; free text. |
See it on real-looking numbers
Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.
Try the demoJoin the private betaFrequently asked questions
What should an equipment log include?
The machine, date, meter hours at start and end, the project and cost code, the operator, fuel, and when service is next due.
How do you calculate an equipment cost per hour?
Add the monthly ownership and maintenance cost, divide by the hours worked in the month, then add the hourly fuel and operator cost.
Why log equipment hours by cost code?
So the cost of the machine is charged to the work it did, and so yards or feet moved can be compared with the machine hours the estimate allowed.
Related guides
More in Templates & forms
- Free construction templates for Excel, Google Sheets and PDF
- Construction scope of work template: what to include, a filled-in example and a free download
- Construction schedule template: activities, workday finish dates and a free Excel download
- Punch list template: the fields that get items closed, an example and a free Excel download
- Construction estimate template: labor, material, equipment and subs by cost code — free Excel
- Construction change order form: what it must show, a priced example and a free template
- Construction daily report template: what to record every day, an example and a free download
- Construction budget template: budget, committed, actual and forecast by cost code — free Excel
- Construction bid template: base bid, alternates, unit prices and exclusions — free Excel
- RFI template: how to write a construction RFI, an example and a free form and log
- Construction proposal template: scope, price, exclusions and payment schedule — free download
- Submittal log template: track every submittal from spec to approval — free Excel
- Construction meeting minutes template: decisions, actions and owners, with a free Excel download
- Toolbox talk template: a sign-in record of the topic, the hazards and who attended, with a free Excel download
- Lien waiver log template: track conditional and unconditional waivers against every payment, with a free Excel download