Equipment log template: hours, fuel and service due for each machine, with a free Excel download

Equipment costs money whether it is working or not, and the only way to charge it to the right job is to record the hours. An equipment log has one row per machine per day: hours on the meter at the start and end, the job and cost code it worked on, the operator, and the fuel. It also shows when service is due. This template is that log.

Updated · 6 minute read

Key takeaways
  • Record meter hours at the start and end of each shift.
  • Charge every hour to a job and cost code.
  • A machine that works few hours has a high hourly rate, which is the case for renting.

What the log records

A filled-in example

EquipmentDateStartEndHoursProject / codeFuel (gal)Service due atFlag
EX-210 excavatorNov 161,842.01,849.57.5Harbour St · 02-200581,900
EX-210 excavatorNov 171,849.51,857.07.5Harbour St · 02-200611,900Service in 43 h
CalculatorEquipment cost per hour

From hours to a cost per hour

An hourly rate lets you charge a machine to a job and check whether owning it pays. Take the monthly ownership cost (payment or depreciation, insurance), add the monthly maintenance, divide by the hours it works in a month, then add fuel and the operator for the operating rate. The calculator below does the sum. A machine that works few hours a month has a high rate per hour, which is the case for renting instead.

Hours logged to a cost code also feed the productivity comparison: yards moved per machine hour against the estimate.

How to fill it in

Record the meter hours at the start and end of each shift, not an estimate. Keep one row per machine per day. Filter by equipment to see its hours and fuel, by project to see what it cost a job, and by the flag to see which machines are due for service.

Checklist
Free template · Equipment log template (Excel & CSV)An Excel workbook with drop-downs, validation and formulas built in — or the same columns as a CSV for Google Sheets and Numbers.
Download Excel (.xlsx)
What this template captures

13 columns: 11 you fill in and 2 calculated by formula and filled down 200 rows, so nothing is worked out by hand. In the Excel version, 6 columns reject entries of the wrong type (a date column only takes dates, an amount column only numbers), the header row stays frozen with filters on it, and the workbook opens on an Instructions sheet that lists every column below.

Every column, and how it is captured
ColumnTypeWhat goes in it
Equipment IDAmount ($)Enter the amount in dollars.
DescriptionTextWhat the line is, in words the other party will recognise.
DateDateDate of the entry.
Start hoursNumberEnter a number.
End hoursNumberEnter a number.
Hours usedCalculatedCalculated: [End hours] − [Start hours]
ProjectTextFree text.
Cost codeTextCost code from your cost code list, matching the estimate and the ERP.
OperatorTextFree text.
Fuel (gal)NumberEnter a number.
Service due at (hours)NumberEnter a number.
Hours to serviceCalculatedCalculated: [Service due at (hours)] − [End hours]
NotesTextAnything that explains the row; free text.

See it on real-looking numbers

Constructelligence is a construction intelligence platform: it reads your ERP, project and field systems read-only and does this arithmetic every week, for every job. The demo runs it on a sample eight-job portfolio.

Try the demoJoin the private beta

Frequently asked questions

What should an equipment log include?

The machine, date, meter hours at start and end, the project and cost code, the operator, fuel, and when service is next due.

How do you calculate an equipment cost per hour?

Add the monthly ownership and maintenance cost, divide by the hours worked in the month, then add the hourly fuel and operator cost.

Why log equipment hours by cost code?

So the cost of the machine is charged to the work it did, and so yards or feet moved can be compared with the machine hours the estimate allowed.

CI
Written by the Constructelligence teamConstruction finance and software. Worked examples use the sample demo portfolio; formulas are standard practice. Reviewed September 2026.